Laserfiche WebLink
Bulldozer Worksheet Cont'd <br />Spoil pile: <br />Push gradient: <br />Altituae: <br />Material weight: <br />Blade type: <br />Not'wuection: U.zUm <br />Aajuz,tca unit production: 127.81 LCY/hr <br />Adjusted fleet production: 127.81 LCY/hr <br />JOH "1'1ME AND COST <br />Task # 02A <br />0.800 <br />(FND-RF) <br />0.666 <br />(CAT HB) <br />1.000 <br />(UA1 tits) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Aajuz,tca unit production: 127.81 LCY/hr <br />Adjusted fleet production: 127.81 LCY/hr <br />JOH "1'1ME AND COST <br />meet SILO: <br />1 Dozer(s) <br />Unit cost: <br />$1.702/LCY <br />Total job time: <br />16.83 Hours <br />Total job cost: <br />$3,661 <br />Page 2 of L <br />