Laserfiche WebLink
Bulldozer Worksheet Com'd <br />Task # O1B <br />Spuil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />0.666 <br />(CAI tin <br />Altitude: <br />l.uuu <br />(CAT HB) <br />Material weight: <br />0.793 <br />_ <br />(CAT HB) <br />Blade type: <br />1.000 <br />(rA 1) <br />Nut cuiiemivu: U.1841 <br />AUjubtea unit Firlauctiou: <br />Adjusted fleet production: <br />JOB '1'1ME AND COST <br />116.77 LCY/hr <br />116.77 LCY/hr <br />Meet brae: 1 vozer(s) <br />Unit cost: $1.789/LCY <br />Total job Lime: 4.28 Hours <br />Total job cost: $895 <br />Page L vI Z <br />