My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-21_REVISION - M2007058
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007058
>
2016-01-21_REVISION - M2007058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:51 PM
Creation date
1/22/2016 10:07:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007058
IBM Index Class Name
Revision
Doc Date
1/21/2016
Doc Name
Approval AM01
From
DRMS
To
C&B
Email Name
ACY
GRM
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPrING wuxr, <br />1 abK ae5c, iEtio.,: Stockpile -Rip and Contour 0.62 Acres <br />Site: Sheeha., P:t re.,.,it Aetw,.: AM 1 <br />PROJECT IDENTIFICATION <br />Task #: 04A State: Colorado <br />Date: 12/10/2015 County: Moffat <br />User: ACY <br />AgeuCy vi o.gill ic.atluu uawe: llKMS <br />HOURLY EOUIPMEN'1 UUS 1' <br />15a3.0 1vlachwC: Cat 1J81 - 95 <br />Kippu, Attacn,nent: 3-5nmac Kippe, <br />Fonnit/iob#: M2007058 <br />Abbreviation: No.,e <br />F&ialine: AICK)8-04a <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />cubt biea0t7wu: <br />Utilization %r <br />Ownership Cost/Hour: <br />$69.05 <br />NA <br />Operating Cost/Hour: <br />$108.22 <br />_ <br />100 <br />Ripper Operating Cost/Hour: <br />$7.46 <br />_ <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />INA <br />Total Unit Cost/Hour: <br />$222.73 <br />Total Fleet Cost/Hour: <br />$222.73 <br />MATERIAL QUANTITIES <br />Setectea ubti,nating <br />,,,etno3: Area <br />Alternate Methods: <br />SeibmiC: NA Bank Volume: NA <br />BCY <br />Area: 0.61. acres Rip Depth (ft): 2.00 <br />Volume: 2,001 <br />Sum= ooI v5tiu.atcd yuautity: <br />MdAlmun, Istuibed <br />area stated in AM -1 <br />HOURLY PRODUC i wiv <br />Seismic: <br />Seismic Velocity: <br />NA <br />feel/30evua <br />Area: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Ave,age Dvv�e, Steed: <br />Avelagu Maucuvc. 1.,,,e: _ <br />Yioauction peg unit area: <br />Job Cu,.d.tiv.. Cu.,eetim, Faet:ns <br />Unadjusted Hourly Unit Production: <br />Site Altitude: <br />Altitude Adj: <br />Job Efficiency: _ <br />Net Cotrect.o..: <br />Adjusted Hourly Unit Production <br />Adjusted Hourly Fleet Production <br />JUB '1'1ME AND CU '1' <br />Fleet size: 1 Grader(s) <br />Unit cost: $381.488 Per acre <br />2.00 <br />7.08 <br />100.00 <br />88.uu <br />0.703 <br />0.703 <br />6,630 <br />1.00 <br />0.83 <br />0.83 <br />0.58 <br />0.58 <br />Total job time: <br />Total J,,b en3t: <br />mph <br />dugyuc3 <br />feet <br />Ioot <br />tout <br />acres/hour <br />Acres/hr <br />feet <br />(CAT HB) <br />(1 shift/day) <br />u,ultipl.e. <br />Acres/hr <br />Ae. e3/hr <br />1.06 <br />$Zi/ <br />IMM <br />BCY o. CCY <br />Huuu.3 <br />CIRCES Coat Estimating Suftw= <br />
The URL can be used to link to this page
Your browser does not support the video tag.