Laserfiche WebLink
PERMIT #: M-1985-112 <br />INSPECTOR’S INITIALS: PSH <br />INSPECTION DATE: January 13, 2016 <br /> <br /> <br />Page 5 of 10 <br />installation.  The Operator will be required to monitor the groundwater levels in the Francis wells to verify if  <br />the installation of the slurry wall restores the Francis well to historic groundwater elevations.  The slurry wall  <br />installation is scheduled for completion in August/September 2016.  Survey stakes for the drill holes to verify  <br />bedrock depth for the slurry wall design were observed during the inspection.  The drilling activities were  <br />scheduled to occur the following week.  <br />  <br />The Operator agreed to provide short‐term replacement irrigation water to mitigate the impact to the  <br />irrigation well on Mr. Francis’s property, Well #2, while the slurry wall is installed at the mine site and the  <br />effects of the slurry wall on the surrounding groundwater levels in the Francis wells are evaluated.  The supply  <br />of temporary water is an appropriate mitigation response by the Operator.  <br />  <br />Overall, based on the observation from this report, the lack of groundwater monitoring data from the  <br />Operator and radius of influence calculation, dated July 3, 2013, provide by the Operator, the Division believes  <br />the Loloff Mine has caused disturbances to the prevailing hydrologic balance of the surrounding area and to  <br />the quantity of water in the groundwater system.    <br />  <br />Photographs taken during the inspection and the inspection map created with the GPS data collected during  <br />the inspection are attached.  <br />  <br />  <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />