Laserfiche WebLink
GSL SAND AND GRAVEL MINE <br /> REPLACEMENT SCHEDULE PER LEASE WITH THE CITY OF AURORA <br /> TABLE 6 <br /> GSL SAND AND GRAVEL MINE <br /> REPLACEMENT SCHEDULE PER LEASE WITH THE CITY OF AURORA <br /> throughNov 2014 October <br /> REPLACEMENT REPLACEMENT <br /> MONTH REQUIRED TRANSIT LOSS PER TOTAL TRANSIT WATER DELIVERY <br /> (ACRE_FEET) MILE(%) LOSS (ACRE-FEET) SCHEDULE <br /> (ACRE-FEET) <br /> NOV 7.32 0.25% 2.70% 7.52 <br /> DEC 6.15 0.25% 2.70% 6.32 <br /> JAN 5.20 0.25% 2.70% 5.34 <br /> FEB 4.47 0.25% 2.70% 4.59 <br /> MAR 3.89 0.25% 2.70% 4.00 <br /> APR 3.63 0.50% 5.39% 3.84 <br /> MAY 3.75 0.50% 5.39% 3.96 <br /> JUN 4.11 0.50% 5.39% 4.34 <br /> JUL 4.71 0.50% 5.39% 4.98 <br /> AUG 5.17 0.50% 5.39% 5.46 <br /> SEP 5.37 0.50% 5.39% 5.68 <br /> OCT 5.161 0.25%1 2.70% 5.30 <br /> TOTAL 58.931 1 1 61.34 <br /> Nov 2015 through October 2016 <br /> R REPLACEMENT <br /> REPLACEMENT <br /> MONTH REQUIRED TRANSIT LOSS PER TOTAL TRANSIT WATER DELIVERY <br /> (ACRE-FEET) MILE(%) LOSS (ACRE-FEET) SCHEDULE <br /> (ACRE-FEET) <br /> NOV 4.69 0.25% 2.70% 4.82 <br /> DEC 4.05 0.25% 2.70% 4.16 <br /> JAN 3.50 0.25% 2.70% 3.60 <br /> FEB 3.08 0.25% 2.70% 3.17 <br /> MAR 2.82 0.25% 2.70% 2.90 <br /> APR 2.78 0.50% 5.39% 2.94 <br /> MAY 3.06 0.50% 5.39% 3.23 <br /> JUN 3.56 0.50% 5.39% 3.76 <br /> JUL 4.27 0.50% 5.39% 4.51 <br /> AUG 4.83 0.50% 5.39% 5.11 <br /> SEP 5.09 0.50% 5.39% 5.38 <br /> OCT 4.94 0.25% 2.70% 5.08 <br /> TOTAL 46.671 1 48.65 <br /> Martin and Wood Water Consultants, Inc. <br /> Job No. 762.2 10/20/2015 2:29 PM <br />