Laserfiche WebLink
RAY PEEK <br />RAY PEEK <br />DOROTHY CESAR <br />DOROTHY CESAR <br />DOROTHY CESAR <br /> <br />P <br />r <br />o <br />p <br />e <br />r <br />t <br />y <br /> <br />o <br />f <br />SCA <br />N <br />I <br />O <br /> <br />T <br />R <br />U <br />S <br />T <br />1000'250'0' <br />SCALE: 1"=500' <br />500' <br />N <br />EXHIBIT F <br />CESAR PIT RECLAMATION PLAN MAP <br />Alta Surveys of Colorado, Inc. <br />813 B Desertflower Blvd <br />719-542-9169 <br />Seeding, types, mixtures, quantities and expected time of seeding: <br />VARIETY SPECIES % MIX PLS/A <br />sideoats gramma Vuaghn or Niner 50 4.5 <br />blue gramma Lovington or Hachita 30 0.9 <br />sand dropseed 10 0.1 <br />switchgrass Granville 10 0.5 <br />TOTAL PLS/A 6.0 <br />This is a typical SCS recommended seed mix for Cascajo Seris soils seeding in this area. <br />Seeding is proposed for the Fall for best results in this area. <br />Fertilization type, quantity andtime of application: <br />SCS recommends 40#/A available N & P to be applied shortly before seeding. <br />Revegitation - types of trees, shrubs, etc. <br />None proposed. <br />An outline of the sequence in which each stage or phase of reclamation will be carried <br />out: <br />a. Grade pit floor <br />b. Topsoil 4" - 8" - average 6" <br />c. Scarify if necessary <br />d. Fertilize <br />e. Drill seed <br />f. Mulch is required <br />The pit floor will be left level with possibly a slight pitch to the south. There will be <br />little to no backsloping as the operation consists solely of removing the tops of some <br />knolls. The only backsloping will be on the north boundary south of St. Charles Road. <br />The reclamation plan will include the additional site preparation guidance of using a <br />cover crop including sorghum, oats, millet, barley or tridacale (sterile wheat), seeded in <br />the summer, then in fall drill reclamation seed including switch grass in the sandy areas <br />on soil preparation and grading consisting of minor undulation, with rougher surfaces <br />preferred over smooth, compacted areas prone to runoff. Soil types throughout the site <br />will be retested upon final grading of areas to be reclaimed and seed mixes, including <br />cover crop seeding, will be subject to further consultation with the soil conservation <br />service and local seed companies to optimize results. Cover crop will be mowed to a <br />height of 1-2 feet annually, and before reclamation seeding. <br />All slopes will be finished 3:1. Rip-rap (size L or K) will be placed for erosion control at <br />locations where arroyo's enter and exit the property. <br />The weed control plan includes recent action to remove tamarisk plants within <br />permitted boundary and any other noxious weeds encountered. <br />The final land use for all portions of the affected lands will be agricultural grazing and <br />ranching. <br />Surrounding land uses in this vicinity are agricultural with a commercial solar power <br />and industrial power plant nearby. <br />˜Š•ȱŠ›ŽŠȱ˜ȱ™Ž›–’ȱŠŒ›ŽŠŽȱ ’••ȱ‹ŽȱŗŞŖȱŒƹǯ <br />The expected physical appearance of the area of affected land will include temporary <br />stockpiles of material being mined, topsoil reserves, and manageable, safe slopes to <br />prevent hazards and site erosion. <br />Legal Description <br />N 1 2 N 1 2 NW 1 4 NE 1 4 of Section 28, Township 21 South, <br />Range 64 West of the 6th P.M. <br />AND <br />The SE 1 4 of Section 21, Township 21 South, Range 64 <br />West of the 6th P.M. lying South and East of Saint <br />Charles Road, EXCEPTING therefrom the S 1 2 of the SE <br />1 4 of the SE 1 4 of said Section 21. <br />AND <br />All that portion of the NE 1 4 of the NW 1 4 and the NW 1 4 <br />of the NW 1 4 and the SW 1 4 of the NW 1 4 of Section 22, <br />Township 21 South, Range 64 West of the 6th P.M. lying <br />South and East of Saint Charles Road <br />AND <br />The N 1 2 of the NW 1 4 of the SW1 4 of said Section 22 <br />lying northerly and easterly of the haul road / private <br />driveway. <br />7KHDERYHGHVFULEHGSDUFHORIODQGFRQWDLQV$F“ <br />DIRECTION OF MINING <br />TYPE K OR L RIP-RAP <br />FINISHED CONTOURS <br /> (Contour lines of all reclaimed lands <br />tied into existing topography upon <br />reclamation) <br />LEGEND <br />AFFECTED AREA <br />(No visible vegetation established) <br />$&“ <br />AREA TO BE MINED <br />$&“ <br />AREA TO BE RECLAIMED <br />(12 Month timeline 2016-2017) <br />$&“ <br />NO MINING AREA <br />$&“ <br />SCOPE OF THE MINING OPERATION CORRELATED TO <br />PROPOSED MINING RECLAMATION TIME TABLES