Laserfiche WebLink
JOB TIME AND COST <br />Total job time: 2.64 Hours <br />Total job cost: $4,061 <br />Carbon Junction Mid Term Review #5 <br />January 2016 Page 18 <br />Total one-way travel distance: <br />4.00 miles <br />Average Travel Speed: <br />25.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />$3,90534 <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />$15530 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non-Roadable Roadable <br />Equipment Equipment <br />Haul Time (Hours): <br />0.16 0.16 <br />Return Time (Hours): <br />0.16 0.16 <br />Loading Time (Hours): <br />0.50 NA <br />Unloading Time (Hours): <br />0.50 NA <br />Subtotals: <br />1.32 0.32 <br />JOB TIME AND COST <br />Total job time: 2.64 Hours <br />Total job cost: $4,061 <br />Carbon Junction Mid Term Review #5 <br />January 2016 Page 18 <br />