My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-23_PERMIT FILE - C1996083A (5)
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2015-12-23_PERMIT FILE - C1996083A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2017 9:02:35 AM
Creation date
1/20/2016 9:22:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
12/23/2015
Doc Name
Appendix B - Protection of Hydrologic Balance
Section_Exhibit Name
Volume XI Coal Mine Waste Disposal Area No. 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spillway Pond J <br />Determine flow velocity down 3h:1v embankment <br />AREA=(W"D)+(X`DA2)= <br />WETTED PERIMETER=(W)+2`[((X*D)A2+DA2)A0 51 <br />R=AREA/WETTED PERIMETER <br />V=(1 49/N)'(RA 667)*(SA.5)= <br />Q=AXV= <br />Q REQUIRED - Peak Discharge <br />Sediment Pond J <br />Riprap Sizing - Down Face of Embankment - Pond . <br />D50 = Size of Riprap <br />D50 = ((V X SA 17)/7 58))A2 <br />D50 = Diameter in feet <br />V = Velocity <br />S = Slope <br />D50 = 1 7 feet <br />Pond Dewatering <br />OPERATIONS CONFIGURATION <br />FEET <br />FEET <br />EXPRESS AS DECIMAL <br />EXPRESS AS DECIMAL <br />SLOPE = X 1 <br />20 inches <br />POND J DEWATERING <br />USE A PUMP WITH A CAPACITY TO DEWATER IN 48 -HOURS <br />POND J <br />Pond J Emergency SpillwaN <br />2.29 Acre -Feet <br />VOLUME <br />Manning's Equation <br />PUMP CAPACITY <br />259 GPM <br />Flow In a Trapezoidal Channe <br />DEPTH <br />D <br />0 500 <br />WIDTH <br />W <br />5 000 <br />Slope <br />S <br />0 330 <br />Mannings "N" <br />N <br />0 040 <br />SIDE SLOPE <br />X <br />2000 <br />AREA=(W"D)+(X`DA2)= <br />WETTED PERIMETER=(W)+2`[((X*D)A2+DA2)A0 51 <br />R=AREA/WETTED PERIMETER <br />V=(1 49/N)'(RA 667)*(SA.5)= <br />Q=AXV= <br />Q REQUIRED - Peak Discharge <br />Sediment Pond J <br />Riprap Sizing - Down Face of Embankment - Pond . <br />D50 = Size of Riprap <br />D50 = ((V X SA 17)/7 58))A2 <br />D50 = Diameter in feet <br />V = Velocity <br />S = Slope <br />D50 = 1 7 feet <br />Pond Dewatering <br />OPERATIONS CONFIGURATION <br />FEET <br />FEET <br />EXPRESS AS DECIMAL <br />EXPRESS AS DECIMAL <br />SLOPE = X 1 <br />20 inches <br />POND J DEWATERING <br />USE A PUMP WITH A CAPACITY TO DEWATER IN 48 -HOURS <br />TR -105 Volume Xi, App. B-6 <br />300 FEET A2 <br />7.24 FEET <br />0.41 <br />11.90 FT/SEC <br />35.69 CFS <br />31.81 CFS <br />09/15 <br />POND J <br />RUNOFF FROM 10 -YEAR, 24-HOUR EVENT <br />2.29 Acre -Feet <br />VOLUME <br />744575 Gallons <br />PUMP CAPACITY <br />259 GPM <br />PUMP SIZE <br />4" <br />Dewatering Time <br />288000 Minutes <br />4800 Hours <br />200 Days <br />TR -105 Volume Xi, App. B-6 <br />300 FEET A2 <br />7.24 FEET <br />0.41 <br />11.90 FT/SEC <br />35.69 CFS <br />31.81 CFS <br />09/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.