Laserfiche WebLink
fill Pile -West <br />fill Pile -East <br />Mine Waste Pile <br />Initial 50 Foot Bench <br />Second 50 Foot Bench <br />Coverfill Pile <br />East Expansion <br />VOLUME XI - GOB PILE #3 <br />Appendix A <br />52,564 <br />Coverfill to be salvaged to complete reclamation: <br />Coal Mine Waste Disposal Area <br />28.225 <br />Salvage Volumes <br />Total: 80,789 <br />In -Place; <br />Area *Topsoil <br />Topsoil <br />Volume Salvaged <br />TOTAL: <br />Acres Depth Ft. <br />CY <br />CY <br />Coverfill Available for reclamation: <br />3.3, 2.4 <br />12,739 <br />COVERFILL PILE (East) <br />24,140 <br />1.0' 2.4 <br />3,678 <br />28,424 <br />19.1 � 2.4 <br />73,955 <br />Totals' 23.34 <br />90,372 <br />Reclamation Volumes <br />Area Topsoil <br />Topsoil <br />From <br />Cover (Req'd) <br />Acres_ Depth Ft. <br />CY Stockpile <br />CY <br />5.2' 1.4 <br />11,835 <br />11,835 <br />21,980 <br />10.8 1.4 <br />24,371 <br />241371 <br />4.5,260 <br />1.0 1.4 <br />2,146 <br />2,146 <br />3,98 <br />2.3 1.4 <br />5,150 <br />5,150 <br />9,564 <br />i <br />Totals 19.26 43,502 43,502 80,789 <br />Coverfill Material Balance: <br />Coverfill in stockpile, available for reclamation: <br />52,564 <br />Coverfill to be salvaged to complete reclamation: <br />28.225 <br />Total: 80,789 <br />In -Place; <br />In -Place; <br />Volume Salvaged <br />TOTAL: <br />CY <br />CY <br />Coverfill Available for reclamation: <br />COVERFILL PILE (East) <br />24,140 <br />52,564 Cover <br />COVERFILL PILE (West, In Gob Footprint) <br />28,424 <br />necessary for gob pile #3, <br />necessary for gob pile #2 (see volume IX, App. A) <br />TOPSOIL PILES, (In Place, From UTL) *** <br />TOPSOIL PILES, (Newly Salvaged)** <br />To be salvaged., <br />In footprint of West Coverfill Pile (3.78 Ac.) <br />52,865 <br />35,460 <br />6,098 <br />- <br />58,943 <br />Subtotal: 87,168 **** <br />Total <br />(Req'd) <br />124,291 <br />TOTAL Topsoil (In-place and to be salvaged): <br />CY <br />41,558 Topsoil <br />NOTES: <br />* UNIFORM TOPSOIL DEPTH ASSUMED IN ORDER TO MATCH QUANTITY CALCULATED <br />PLEASE SEE VOLUMEXI, SECTION 'RECLAMATION" FOR A DISCUSSION OF THE SALVAGE vs. ACTUAL TOPSOIL VALUES_ <br />** 6,500 CYADDED TO PREVIOUS TOTAL OF28,424 CY based on 04/09/2014 infield survey <br />***TOPSOIL TO BE USED FOR RECLAMATION AT UNIT TRAIN LOADOUT, NOT GOB PILE #3 (See Volume Xi Figure 1 fordetails) <br />**** AMOUNT EQUATES TO SALVAGE DEPTH OF 15.0' IN FOOTPRINT OF GOB PILE #3 WHERE WEST COVERFILL <br />PILE IS CURRENTLY LOCATED -- IF NECESSARY, SALVAGE DEPTH COULD BE INCREASED TO PROVIDE ADDITIONAL <br />COVERFILL FOR RECLAMATION OF GOB PILES 2-4. <br />TR -105 App. A 10/15 <br />