fill Pile -West
<br />fill Pile -East
<br />Mine Waste Pile
<br />Initial 50 Foot Bench
<br />Second 50 Foot Bench
<br />Coverfill Pile
<br />East Expansion
<br />VOLUME XI - GOB PILE #3
<br />Appendix A
<br />52,564
<br />Coverfill to be salvaged to complete reclamation:
<br />Coal Mine Waste Disposal Area
<br />28.225
<br />Salvage Volumes
<br />Total: 80,789
<br />In -Place;
<br />Area *Topsoil
<br />Topsoil
<br />Volume Salvaged
<br />TOTAL:
<br />Acres Depth Ft.
<br />CY
<br />CY
<br />Coverfill Available for reclamation:
<br />3.3, 2.4
<br />12,739
<br />COVERFILL PILE (East)
<br />24,140
<br />1.0' 2.4
<br />3,678
<br />28,424
<br />19.1 � 2.4
<br />73,955
<br />Totals' 23.34
<br />90,372
<br />Reclamation Volumes
<br />Area Topsoil
<br />Topsoil
<br />From
<br />Cover (Req'd)
<br />Acres_ Depth Ft.
<br />CY Stockpile
<br />CY
<br />5.2' 1.4
<br />11,835
<br />11,835
<br />21,980
<br />10.8 1.4
<br />24,371
<br />241371
<br />4.5,260
<br />1.0 1.4
<br />2,146
<br />2,146
<br />3,98
<br />2.3 1.4
<br />5,150
<br />5,150
<br />9,564
<br />i
<br />Totals 19.26 43,502 43,502 80,789
<br />Coverfill Material Balance:
<br />Coverfill in stockpile, available for reclamation:
<br />52,564
<br />Coverfill to be salvaged to complete reclamation:
<br />28.225
<br />Total: 80,789
<br />In -Place;
<br />In -Place;
<br />Volume Salvaged
<br />TOTAL:
<br />CY
<br />CY
<br />Coverfill Available for reclamation:
<br />COVERFILL PILE (East)
<br />24,140
<br />52,564 Cover
<br />COVERFILL PILE (West, In Gob Footprint)
<br />28,424
<br />necessary for gob pile #3,
<br />necessary for gob pile #2 (see volume IX, App. A)
<br />TOPSOIL PILES, (In Place, From UTL) ***
<br />TOPSOIL PILES, (Newly Salvaged)**
<br />To be salvaged.,
<br />In footprint of West Coverfill Pile (3.78 Ac.)
<br />52,865
<br />35,460
<br />6,098
<br />-
<br />58,943
<br />Subtotal: 87,168 ****
<br />Total
<br />(Req'd)
<br />124,291
<br />TOTAL Topsoil (In-place and to be salvaged):
<br />CY
<br />41,558 Topsoil
<br />NOTES:
<br />* UNIFORM TOPSOIL DEPTH ASSUMED IN ORDER TO MATCH QUANTITY CALCULATED
<br />PLEASE SEE VOLUMEXI, SECTION 'RECLAMATION" FOR A DISCUSSION OF THE SALVAGE vs. ACTUAL TOPSOIL VALUES_
<br />** 6,500 CYADDED TO PREVIOUS TOTAL OF28,424 CY based on 04/09/2014 infield survey
<br />***TOPSOIL TO BE USED FOR RECLAMATION AT UNIT TRAIN LOADOUT, NOT GOB PILE #3 (See Volume Xi Figure 1 fordetails)
<br />**** AMOUNT EQUATES TO SALVAGE DEPTH OF 15.0' IN FOOTPRINT OF GOB PILE #3 WHERE WEST COVERFILL
<br />PILE IS CURRENTLY LOCATED -- IF NECESSARY, SALVAGE DEPTH COULD BE INCREASED TO PROVIDE ADDITIONAL
<br />COVERFILL FOR RECLAMATION OF GOB PILES 2-4.
<br />TR -105 App. A 10/15