Laserfiche WebLink
Wc57 D,-,; AREA <br />RESERVED FOR <br />COMPACTION <br />A <br />EAST DRYING AREA <br />GOB PILE FOOT PRINT '+ / <br />SHOWS ORIENTATION OF STACKED GOB <br />r / "IA <br />?IL <br />t � <br />sT ex E <br />ACTIVE GOB PLME <br />NO COMPACTION REA 8.2 Ac <br />J /_ G— <br />_ DISTURBED Al NDARY <br />/ <br />• / /J TT �' <br />A <br />RE4 - r# Ac.c. t <br />AREA SECTION A -A <br />-r1 � <br />T. WINTER GOB STACKING PLAN <br />NO PILE OVERLAP <br />< SPACE BETWEEN ROWS TO BE GRADED <br />TO ACHIEVE POSITIVE DRAINAGE. MAINTAIN <br />FLOW PATH AS NECESSARY, <br />N PROJECT BOWIE RESOURCES, LLC <br />W E TITLE: GOB PILE #3 DRYING/PLACEMENT LOCATION <br />ION ONE OPERATIONAL SEDIMENTATION CONTROL PLAN <br />DESIGNED BY: J.E.S. 02/27/14 DMG I.D. No. C - 1996 - 083 DWG. NAME <br />REVISED BY T.K.B. 09/25/15 SCALE <br />NOT TO SCALE <br />TR -105 -VOLUME XI, 4b- 09/15 <br />c <br />r / "IA <br />?IL <br />t � <br />sT ex E <br />ACTIVE GOB PLME <br />NO COMPACTION REA 8.2 Ac <br />J /_ G— <br />_ DISTURBED Al NDARY <br />/ <br />• / /J TT �' <br />A <br />RE4 - r# Ac.c. t <br />AREA SECTION A -A <br />-r1 � <br />T. WINTER GOB STACKING PLAN <br />NO PILE OVERLAP <br />< SPACE BETWEEN ROWS TO BE GRADED <br />TO ACHIEVE POSITIVE DRAINAGE. MAINTAIN <br />FLOW PATH AS NECESSARY, <br />N PROJECT BOWIE RESOURCES, LLC <br />W E TITLE: GOB PILE #3 DRYING/PLACEMENT LOCATION <br />ION ONE OPERATIONAL SEDIMENTATION CONTROL PLAN <br />DESIGNED BY: J.E.S. 02/27/14 DMG I.D. No. C - 1996 - 083 DWG. NAME <br />REVISED BY T.K.B. 09/25/15 SCALE <br />NOT TO SCALE <br />TR -105 -VOLUME XI, 4b- 09/15 <br />