My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-18_REPORT - M1977493
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977493
>
2016-01-18_REPORT - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:36 PM
Creation date
1/20/2016 8:33:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REPORT
Doc Date
1/18/2016
Doc Name
Asbestos Disposal Shaft Closure Report
From
Climax Molybdenum
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIFICATION NUMBER: <br /> CONCRETE CONSTRUCTION 03 30 00 SPE <br /> Climax Molybdenum <br /> AFreeporr-McMoRarCompany TECHNICAL SPECIFICATION PROJECT NAME: <br /> CAVR Shaft Closure Project <br /> CONCRETE QUALITY CONTROL CHECKLIST <br /> PROJECT NAME: DRAWING NO./REV.: <br /> CONTRACT NO.: DESCRIPTION: <br /> POUR NO.: LOCATION: <br /> DATE: MIX DESIGN: <br /> PRE-PLACEMENT INSPECTIONS <br /> ITEM ATTRIBUTE INITIALS COMMENTS <br /> &DATE <br /> 1 Verify subgrade compaction. <br /> 2 Verify formwork for: location,elevations,orientation,tolerances, <br /> and chamfers. <br /> 3 Verify forms are properly tied and braced. <br /> 4 Verify quantity,location, size,and projection of structural embeds. <br /> 5 Verify rebar: size,grade,support,position,coverage,and <br /> cleanliness. <br /> 6 Verify construction joint preparation:cleanliness of keyways and <br /> waterstops. <br /> 7 Verify quantity,location,and size of: <br /> A. Piping embeds <br /> B. Plumbing embeds <br /> C. Electrical embeds <br /> 8 Verify alignment check and elevations of anchor rods and other <br /> critical embeds. <br /> 9 Verify placement area cleanliness,wetness,and final preparation. <br /> 10 Verify Key material correct size and location for installation. <br /> 11 Verify availability of adequate placing equipment and staging area. <br /> 12 Verify provisions for hot/cold weather. Weather concreting per ACI <br /> 305 and 306. <br /> Chief Construction Engineer Approval of Placement Date: <br /> PLACEMENT/POST PLACEMENT INSPECTIONS INITIALS COMMENTS <br /> &DATE <br /> 13 Verify independent laboratory performs required tests—adequate <br /> samples taken,and that fresh concrete test results meet requirements. <br /> 14 Verify batch tickets have required information. <br /> 15 Record water added/authorization. <br /> 16 Verify placement within time limits. <br /> 17 Verify consolidation,free fall,and lateral movement. <br /> 18 Verify any additional embeds are properly located. <br /> 19 Verify proper finish. <br /> 20 Verify implementation of hot/cold weather practices. <br /> 21 Verify proper curing practices. <br /> 22 Verify formwork,shoring,and reshoring removal time. <br /> 23 Verify control joint locations. <br /> Chief Construction Engineer Approval of Placement/Post Placement and Date: <br /> 24 Concrete strength test results acceptable. (QA to verify) <br /> QC Coordinator Verification/Date: <br /> Client Acceptance/Date(if required): <br /> END OF SECTION <br /> 114-910345 CONCRETE CONSTRUCTION <br /> Climax CAVR Shaft Closure Project 03 30 00 SPE-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.