Laserfiche WebLink
SPECIFICATION NUMBER: <br /> :. Climax Molybdenum CONCRETE CONSTRUCTION 03 30 00 SPE <br /> A Freeporl-McMoRan Company TECHNICAL SPECIFICATION PROJECT NAME: <br /> CAVR Shaft Closure Project <br /> chutes, vibrators, and provision of cold or hot weather equipment or <br /> materials required; and the provisions for work platforms, barricades and <br /> safety provisions. <br /> 2. Materials supplied and work performed under this Specification may, at the <br /> Engineer's option, be inspected in the shop or batch plant, and will be <br /> inspected in the field. The Contractor shall provide facilities for shop or <br /> batch plant inspection, if requested by the Engineer or Owner, at no <br /> additional cost to the Owner. Inspection of material does not in any way <br /> relieve the Contractor of responsibility for the quality and accuracy of the <br /> material. <br /> 3. Material or work not meeting the requirements specified herein will be <br /> rejected and shall be replaced at the Contractor's expense. <br /> 4. The Contractor shall be responsible for all errors in detailing and <br /> fabrication. <br /> 114-910345 CONCRETE CONSTRUCTION <br /> Climax CAVR Shaft Closure Project 03 30 00 SPE-26 <br />