My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-18_REPORT - M1977493
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977493
>
2016-01-18_REPORT - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:36 PM
Creation date
1/20/2016 8:33:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REPORT
Doc Date
1/18/2016
Doc Name
Asbestos Disposal Shaft Closure Report
From
Climax Molybdenum
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIFICATION NUMBER: <br /> '°tet CONCRETE CONSTRUCTION 03 30 00 SPE <br /> „Climax l PolYbdontim <br /> A Freeport-McMoRan Company TECHNICAL SPECIFICATION PROJECT NAME: <br /> CAVR Shaft Closure Project <br /> 3. "Broomed Finish" shall be performed after the "Float Finish" by drawing a <br /> natural bristle broom across the surface to produce corrugations of regular <br /> appearance not over 1/16 inch deep. The fibers shall be kept clean by <br /> frequent washings; cake on the fibers shall not be allowed to score the <br /> surface. <br /> P. Repairing and Patching Formed Surfaces <br /> 1. Concrete surfaces shall be repaired immediately after form removal. <br /> Cavities produced by form ties, honeycomb, rockpockets, spalling or other <br /> similar defects shall be thoroughly cleaned and kept saturated with water <br /> for a period of at least 1 hour prior to repair. Before placing dry-pack or <br /> mortar, a grout of cement and water mixed to the consistency of paint shall <br /> be brushed into the surfaces to which the dry-pack or mortar is to be bonded. <br /> Repair of defective areas shall be in accordance with ACI 301, Section 5. <br /> Q. Protection and Curing <br /> 1. Protection and curing shall be accomplished by preventing loss of moisture, <br /> rapid temperature change, mechanical injury, or damage from rain, frost or <br /> flowing water. Curing shall be started after placing and fmishing as soon <br /> as the surface conditions are suitable. Curing of formed surfaces shall be <br /> accomplished by moist curing with forms in place for the full curing period, <br /> or, if forms are removed prior to the end of the curing period, by one of the <br /> following methods, or combinations thereof. <br /> 2. The minimum curing periods for concrete placed hereunder,except as noted <br /> in ACI 306, shall be: <br /> Curing Temperature Curing Period <br /> 50°F-70°F 7 days <br /> 70°F- 100°F 5 days <br /> a. Membrane Curing: Pressure spray tinted curing compounds shall be <br /> of the type approved by the Engineer. The compound shall be <br /> applied according to the Manufacturer's directions, immediately <br /> after finishing operations are completed and forms removed. The <br /> quantity applied shall be sufficient to ensure the formation of a <br /> continuous unbroken film. <br /> i. Curing compound shall not be used or permitted on surfaces <br /> where future bonding, concrete hardener, or painting is <br /> indicated. Such surfaces shall be cured by the moist process <br /> as specified previously. <br /> 114-910345 CONCRETE CONSTRUCTION <br /> Climax CAVR Shaft Closure Project 03 30 00 SPE-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.