My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-18_REPORT - M1977493
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977493
>
2016-01-18_REPORT - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:36 PM
Creation date
1/20/2016 8:33:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REPORT
Doc Date
1/18/2016
Doc Name
Asbestos Disposal Shaft Closure Report
From
Climax Molybdenum
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIFICATION NUMBER: <br /> ClimaxMolybdenum CONCRETE CONSTRUCTION 03 30 00 SPE <br /> A Freeport-McMoRan Company TECHNICAL SPECIFICATION PROJECT NAME: <br /> CAVR Shaft Closure Project <br /> 1. Form materials shall be as specified on the Design Drawings and under <br /> Section 3.02E of this Specification. <br /> I. Epoxy Material <br /> 1. Epoxy bonding agent adhesives or grout shall be Hilti HIT-HY200 as <br /> manufactured by Hilti Inc., or Engineer approved alternative. Type and <br /> grade shall be as shown on the Design Drawings for each particular <br /> application. <br /> J. Fly Ash <br /> 1. Class F fly ash may be used in the concrete for this project. The fly ash <br /> shall meet the requirements of ASTM C618, and shall be tested in <br /> accordance with ASTM C311. <br /> 2. All fly ash used on the project shall be from one source and its quality shall <br /> be monitored throughout the duration of its use. <br /> 3. Fly ash shall be stored as a cementitious material per Section 2.02A.3. <br /> 2.03 PACKAGING AND SHIPPING <br /> A. Reinforcement <br /> 1. Packaging: Bars shall be bundled and tagged in accordance with the latest <br /> revision of the Manual of Standard Practice, as published by the Concrete <br /> Reinforcing Steel Institute. <br /> 2. Storing: Reinforcing steel shall be handled and stored in a manner to avoid <br /> distortion,excessive rusting,and objectionable coatings ofpaint,oil,grease, <br /> dried mud, dried mortar or any other materials. Bars shall be stored so that <br /> each may be identified after bundles are broken. <br /> B. Accessories <br /> 1. Accessories shall be stored in a manner to avoid distortion and objectionable <br /> coatings. All materials shall be stored in a manner to prevent it being <br /> damaged, lost or misplaced. <br /> PART 3 - EXECUTION <br /> 114-910345 CONCRETE CONSTRUCTION <br /> Climax CAVR Shaft Closure Project 03 30 00 SPE-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.