Laserfiche WebLink
-4- <br />12. Prima future (Post -mining) land use (check one):_EIB <br />Cropland(CR) <br />Rangeland(RL) <br />Residential(RS) <br />Pastureland(PL) <br />Forestry(FR) <br />Recreation(RC) <br />Developed Water Resources(WR) <br />13. Prima ' resent land use check one : <br />Cropland(CR) I Pastureland(PL) <br />1-1 Rangeland(RL) I Forestry(FR) <br />Residential(RS) I Recreation(RC) <br />.._ Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />[ndustrial/Commercial(IC) <br />ti Solid Waste Disposal(WD) <br />EGeneral Agriculture(GA) <br />Wildlife Habitat(WL) <br />IIIndustrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />top soil/ overburden stockpiled with dozer and scraper. dozer to push up material front end loader to load tucks. <br />15. On Site Processing: <br />1-1 Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />material to be pushed up and hauled out no processing <br />List any designated chemicals or acid -producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />N/A <br />