My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-14_REVISION - C1981014 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2016-01-14_REVISION - C1981014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:33 PM
Creation date
1/19/2016 7:08:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
1/14/2016
Doc Name
Letter & Application
From
Energy Fuels Coal Inc
To
DRMS
Type & Sequence
MR70
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />REGE!a <br />APPLICATION FORM FOR A REVISION JAN 1 ' <br />TO A COAL MINING AND RECLAMATION PERMIT Division of Recta m,at1r) <br />Mining & saff <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(7�3Y <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right comer of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1981 _ 014 Date: 01 / 13 /2016 <br />Permittee: ENERGY FUELS COAL, INC. <br />SOUTHFIELD MINE <br />Street: 115 E. MAIN ST. <br />P.O. BOX 459 <br />City: FLORENCE <br />State: CO Zip Code: 81226 <br />Brief Description of Revision: MR No. 70: PERMANENT TOPSOIL PILES <br />Public Notice Attached: Yes❑ No ❑✓ (Required for PRs and TRs) <br />Bond Increase: Yes❑ No❑ Federal ❑ Non -Federal ❑✓ Mine <br />Proposed Change in: <br />Permit Area - Surface Ownership - <br />Disturbed (+/-) T _0.0 Acres Private Land (+/-) _ _ _ p.0 Acres <br />Permit (+/-) _ _ ^0.0 Acres <br />Affected (+/-) _ _ _0.0 Acres <br />Mineral Ownership - <br />Mineral Private (+/-) _ _ _ 0.0 Acres <br />Mineral Federal (+/-) _ _ _.0-0 Acres <br />Federal Land (+/-) _ ! _ 0.0 Acres <br />State Land (+/-) _ _ 0.0 Acres <br />Mineral State (+/-) _ _ 0.0 Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.