My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-15_REPORT - C1981018
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981018
>
2016-01-15_REPORT - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:34 PM
Creation date
1/19/2016 7:06:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Report
Doc Date
1/15/2016
Doc Name
4th Quarter 2015 Waste Bank
From
Blue Mountain Energy
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 DESERADO MINE <br />BLUE MOUNTAIN ENERGY <br />3607 County Rd. 65 <br />Rangely, CO 81648 <br />(970)675-4300 <br />fax (970)675-4399 <br />January 11, 2016 <br />Mr. Clayton Wein <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Professional Certification for the Coal Processing Waste Banks <br />Deserado Mine - Permit No. C-1981-018 <br />Dear Clayton: <br />RECEIVEr) <br />Division ofRecia <br />Mining & Sai ation, <br />During the fourth quarter of 2015, qualified persons working under my direction and I conducted <br />a series of compliance inspections on the active coal processing waste banks located within the <br />Deserado permit area. These inspections were conducted roughly on a bi-weekly basis. <br />I am a professional engineer registered in the State of Colorado and my experience fulfills the <br />requirements of the Colorado Surface Coal Mining Reclamation Act. <br />The purpose of these inspections and subsequent certification is to ensure proper construction of <br />the refuse piles and to satisfy the requirements of Rule 4.10.2 of the Colorado Mined Land <br />Reclamation Board. <br />INSPECTION OF ACTIVE AREAS 2-3-4 and 5A <br />There are no apparent points of seepage, or indications of slope failure on the active piles. The <br />surface drainage facilities were adequately maintained and were working properly to convey <br />surface runoff. Sediment control structures need periodic maintenance and are cleaned out as <br />conditions warrant. <br />The following maintenance work was completed since the last quarterly report: <br />1. Refuse was placed, spread, and compacted on Areas 2-3-4 and 5A during the quarter. <br />2. A winter stockpile was started on Area 5A. <br />Our permit requires no sub -drain system, as geotechnical investigations for the disposal site <br />revealed no groundwater present. <br />Refuse is spread and compacted in lifts not exceeding 24" in depth. Typically refuse is spread <br />much thinner producing 6" to 8" lifts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.