Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Geomembrane Fusion Trial Seam Summary <br />DATE SAMPLE <br />NUMBER TIME MACHINE <br />NUMBER <br />WELD <br />TECH. <br />AMBIENT <br />AIR <br />TEMPERATURE <br />(oF) <br />MACHINE SETTINGS <br />QA <br />MONITOR REMARKSMACHINE <br />TEMPERATURE <br />(oF) <br />SPEED <br />SETTING <br />(fps) <br />INSIDE PEEL <br />(Min.=100) <br />OUTSIDE PEEL <br />(Min.=100) <br />SHEAR <br />(Min.=130) <br />STENGTH <br />(ppi)MODE1 <br />10/08/14 TF-1 2:12 PM 93 JR 63 850 11.0 165 BRK PASS DW Textured on Textured <br />STENGTH <br />(ppi)MODE1 STENGTH <br />(ppi)MODE <br />TEST RESULTS <br />PASS <br />OR <br />FAIL <br />144 SE1 125 SE1 <br />137 SE1 126 SE1 <br />119 SE1 130 SE1 <br />114 SE1 127 SE1 <br />120 SE1 124 SE1 <br />125 SE1 122 SE1 <br />149 SE1 151 SE1 <br />143 SE1 166 SE1 <br />156 SE1 147 SE1 <br />150 SE1 141 SE1 <br />148 SE1 148 SE1 <br />151 SE1 144 SE1 <br />155 SE1 151 SE1 <br />160 SE1 151 SE1 <br />112 SE1 109 SE1 <br />113 SE1 112 SE1 <br />123 SE1 106 SE1 <br />132 SE1 124 SE1 <br />163 SE1 171 SE1 <br />167 SE1 169 SE1 <br />153 SE1 146 SE1 <br />170 SE1 159 SE1 <br />153 SE1 139 SE1 <br />160 SE1 156 SE1 <br />147 SE1 131 SE1 <br />119 SE1 148 SE1 <br />113 SE1 112 SE1 <br />117 SE1 115 SE1 <br />120 SE1 111 SE1 <br />120 SE1 120 SE1 <br />119 SE1 112 SE1 <br />127 SE1 134 SE1 <br />118 SE1 106 SE1 <br />123 SE1 119 SE1 <br />133 SE1 113 SE1 <br />126 SE1 117 SE1 <br />08/04/15 TF-307 2:30 PM 92 JR 69 835 12.0 135 BRK PASS AF Textured on Textured <br />08/04/15 TF-308 3:10 PM 96 RR 69 800 12.0 121 BRK PASS AF Textured on Textured <br />08/04/15 TF-309 4:15 PM 92 JR 68 835 12.0 144 BRK PASS AF Smooth on Textured <br />08/05/15 TF-310 7:12 AM 92 JR 55 835 12.0 169 BRK PASS KS Textured on Textured <br />08/05/15 TF-311 7:18 AM 92 JR 55 835 12.0 163 BRK PASS KS Smooth on Smooth <br />08/05/15 TF-312 7:31 AM 96 RR 55 830 12.0 178 BRK PASS KS Smooth on Smooth <br />08/05/15 TF-313 7:19 AM 96 RR 56 830 12.0 151 BRK PASS KS Textured on Textured <br />08/05/15 TF-314 12:59 PM 96 RR 74 830 12.0 120 BRK PASS KS Smooth on Smooth <br />08/05/15 TF-315 12:56 PM 96 RR 74 830 12.0 126 BRK PASS KS Textured on Textured <br />08/06/15 TF-316 7:12 AM 92 JR 60 835 12.0 193 BRK PASS AF Smooth on Smooth <br />08/06/15 TF-317 7:16 AM 92 JR 60 835 12.0 177 BRK PASS AF Textured on Textured <br />08/06/15 TF-318 7:10 AM 96 RR 60 800 12.0 154 BRK PASS AF Smooth on Smooth <br />08/06/15 TF-319 7:04 AM 96 RR 60 800 12.0 164 BRK PASS AF Textured on Textured <br />08/06/15 TF-320 12:57 PM 96 RR 78 800 12.0 120 BRK PASS AF Smooth on Smooth <br />08/06/15 TF-321 1:00 PM 96 RR 78 800 12.0 120 BRK PASS AF Textured on Textured <br />08/06/15 TF-322 1:05 PM 92 JR 78 835 12.0 126 BRK PASS AF Smooth on Smooth <br />08/06/15 TF-323 1:12 PM 92 JR 78 835 12.0 121 BRK PASS AF Smooth on Textured <br />08/06/15 TF-324 1:07 PM 92 JR 78 835 12.0 122 BRK PASS AF Textured on Textured <br />1 See Figures 3 for Modes <br />Page 18 of 39