Laserfiche WebLink
<br />Section 01050 Page 3 of 3 January 14, 2011 <br />Construction Staking Revision 0 <br /> <br />S:\Projects\1125G Squaw Gulch Valley Leach Facililty Design\I - Tech Specs\01050.r1.doc <br /> 3. Provide continuous northing, easting, and elevation reference for field testing and <br />sampling location identification. <br /> <br /> 4. Provide depth verification for the Low Volume Solution Collection Fill on a 50-foot by <br />50-foot grid with additional points at all grade breaks. <br /> <br />5. Provide depth verification for Drain Cover Fill on a 50-foot by 50-foot grid with <br />additional survey points at all breaks in grade. <br /> <br />6. Provide northing, easting and elevation reference for any underground working <br />confirmatory drillhole and blasthole locations. <br /> <br /> Northings, eastings, and elevations for Items 1, 2, 3 and 6 will be performed on a daily basis and <br />results will be provided to the MANAGER in both electronic and hardcopy format within 24 hours <br />of performing the survey. <br /> <br /> *** END OF SECTION *** <br /> <br />