Laserfiche WebLink
<br />Section 01050 Page 1 of 3 January 14, 2011 <br />Construction Staking Revision 0 <br /> <br />S:\Projects\1125G Squaw Gulch Valley Leach Facililty Design\I - Tech Specs\01050.r1.doc <br />SECTION 01050.0 CONSTRUCTION STAKING AND CONSTRUCTION DOCUMENTATION <br /> <br />PART 1: GENERAL <br /> <br />1.01 SUMMARY: <br /> <br /> This Section defines the control staking services required by the CONTRACTOR. All staking and surveying <br />will be the responsibility of the CONTRACTOR unless otherwise specifically defined in this section. All <br />grade checking and transferring of lines and grades from CC&V’s stakes will be the CONTRACTOR'S <br />responsibility. <br /> <br />1.02 CONTROL STAKES: <br /> <br /> Control stakes which are reference points for all construction work will be conspicuously marked. It shall be <br />the responsibility of the CONTRACTOR to inform his employees and his subcontractors of their importance <br />and the necessity for their preservation. At least forty-eight (48) hours written advance request for removal of <br />control stakes shall be given to CC&V. A total of ten (10) control stakes will be provided to the <br />CONTRACTOR by CC&V for this work. <br /> <br /> Control stakes shall be set one time only. <br /> <br />1.03 FLAGGING CODE: <br /> <br /> A color code will be established by the CONTRACTOR during the course of the project indicating specific <br />colors for the various kinds of stakes to be set. <br /> <br />1.04 STAKING: <br /> <br /> A. CC&V will provide vertical and horizontal reference control stakes in the proximity of the work as <br />discussed in Article 1.02 of this Section. <br /> <br /> B. The CONTRACTOR shall be responsible for setting construction and grade stakes and for proper <br />preservation of control points. <br /> <br /> C. The CONTRACTOR will provide as-built coordinates and elevations for the Underdrains, Leak <br />Detection system, Low Volume Solution Collection piping and High Volume Solution Collection <br />piping or as requested by the MANAGER. <br /> <br />1.05 CONSTRUCTION CERTIFICATION DOCUMENTATION: <br /> <br /> A. The CONTRACTOR shall be responsible for accurately surveying the locations and elevations, and <br />where applicable, the type, thickness, and geometry of any and all pipes and fittings, ditches, <br />geosynthetic materials, breaks in fill or cut slopes, general grading, change in fill or synthetic <br />material type, and any other aspect of the work to facilitate construction and as required by the <br />MANAGER. <br /> <br /> B. Submittals By CONTRACTOR Upon Completion of Work: <br /> <br /> Within seven (7) calendar days after completion of the WORK, CONTRACTOR shall furnish <br />MANAGER with "Record Drawings" (also referred to as "As-Built Drawings") of the Work. The <br />Record Drawing will be drawn at a scale of 1-inch equals 100 feet with 10 foot topographic contour <br />interval, and on a 24-inch by 36-inch sheet. All surveying Record Drawings shall be signed and <br />sealed by the Colorado licensed surveyor who directed the work. The required surveying shall be