My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-14_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-14_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:33 PM
Creation date
1/15/2016 3:17:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
1/14/2016
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Section 02200 Page 5 of 18 January 14, 2011 <br />Earthworks Revision 0 <br /> <br />S:\Projects\1125G Squaw Gulch Valley Leach Facililty Design\I - Tech Specs\02200.r0.doc <br /> <br />10. Fine Shaft Backfill - material as approved by MANAGER and CERTIFYING <br />ENGINEER conforming to the following SPECIFICATIONS: <br />U.S. Standard <br />Sieve Size <br />Percent Passing <br />by Dry Weight <br />2-inch 100 <br />¾-inch 70 – 100 <br />No. 40 20 – 50 <br />No. 200 2 – 15 <br />Plasticity Index: 15 maximum <br /> <br />11. Pipe Bedding Material - material as approved by MANAGER and CERTIFYING <br />ENGINEER conforming to the following SPECIFICATIONS: <br />U.S. Standard <br />Sieve Size <br />Percent Passing <br />by Dry Weight <br />2-inch 100 <br />No. 4 30 – 100 <br />No. 200 5 – 20 <br />Plasticity Index: 15 maximum <br /> <br />12. Granular Filter Material - material as approved by MANAGER and CERTIFYING <br />ENGINEER conforming to the following SPECIFICATIONS: <br />U.S. Standard <br />Sieve Size <br />Percent Passing <br />by Dry Weight <br />3-inch 100 <br />2-inch 75 – 100 <br />No. 200 0 – 15 <br />Plasticity Index: 15 maximum <br /> <br />PART 3: EXECUTION <br />3.01 CLEARING AND GRUBBING: <br />A. Clearing and grubbing shall be done within the footprint of the limits of the construction area, as <br />delineated on the DRAWINGS. Clearing shall extend a maximum of 15 feet and a minimum of 10 <br />feet outside of the construction limits or as directed by MANAGER. Areas for clearing shall be <br />released to CONTRACTOR by MANAGER. No pioneering of roads across undisturbed areas <br />shall be allowed without prior approval of MANAGER.
The URL can be used to link to this page
Your browser does not support the video tag.