My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-14_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-14_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:33 PM
Creation date
1/15/2016 3:17:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
1/14/2016
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Section 02200 Page 2 of 18 January 14, 2011 <br />Earthworks Revision 0 <br /> <br />S:\Projects\1125G Squaw Gulch Valley Leach Facililty Design\I - Tech Specs\02200.r0.doc <br />cooperating with CQA Monitor during all testing activities. CONTRACTOR shall provide <br />equipment and labor to assist CQA Monitor in sampling, if requested, and shall also provide access <br />to all areas requiring testing activities. Quality Control testing shall be the responsibility of the <br />CONTRACTOR. <br />D. All excavation, backfill, and grading operations shall be carried out under the observation of <br />MANAGER and CERTIFYING ENGINEER. <br />E. Any work found unsatisfactory or any work disturbed by subsequent operations before acceptance is <br />granted shall be corrected by CONTRACTOR, at its sole cost. <br />PART 2: PRODUCTS <br />2.01 MATERIALS: <br />A. Fill materials will be soils, gravels, or rock fill approved by MANAGER and CERTIFYING <br />ENGINEER. The materials shall be free of organic matter, debris, frozen material, and other <br />deleterious materials, and shall be excavated, as required, as follows: <br />1. Structural Fill - material as approved by MANAGER and CERTIFYING ENGINEER <br />conforming to the following SPECIFICATION: <br />U.S. Standard <br />Sieve Size <br />Percent Passing <br />by Dry Weight <br />24 – inch 100 <br />No. 200 0 – 25 <br />Plasticity Index: 30 maximum <br /> <br />2. Select Structural Fill - well graded granular soil or sound, hard, durable, rockfill excavated <br />on-site or supplied from off-site mine waste rock with a maximum particle size of 3 inches <br />as approved by MANAGER and CERTIFYING ENGINEER. <br />3. Underdrain Fill - free draining, material approved by MANAGER and CERTIFYING <br />ENGINEER conforming to the following SPECIFICATION. <br />U.S. Standard <br />Sieve Size <br />Percent Passing <br />by Dry Weight <br />12-inch 100 <br />No. 200 0 – 6 <br />Point load tensile strength: > 300 psi <br />Plasticity Index: 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.