Laserfiche WebLink
<br />Section 01400.2 Page 11 of 11 January 14, 2011 <br />Geosynthetic CQA Plan Revision 0 <br /> <br />S:\Projects\1125G Squaw Gulch Valley Leach Facililty Design\I - Tech Specs\01400.2.r0.doc <br /> copies of weekly reports; <br /> CONTRACTOR'S subgrade acceptance forms; <br /> temperature monitoring results; <br /> geosynthetic quality control documents; <br /> geosynthetic quality assurance documents; <br /> geomembrane installation observations, such as for deployment, trial seams, defect repair, <br />destruct testing and non-destructive testing; <br /> sampling, testing locations, and test results; <br /> changes to the design DRAWINGS or project SPECIFICATIONS and the justification for <br />these changes; <br /> record DRAWINGS; and <br /> a certification statement that construction was completed in compliance with the <br />DRAWINGS and SPECIFICATIONS, signed, and sealed by the CERTIFYING <br />ENGINEER registered in the State of Colorado. <br />*** END OF SECTION ***