Laserfiche WebLink
<br />Section 01400.2 Page 5 of 11 January 14, 2011 <br />Geosynthetic CQA Plan Revision 0 <br /> <br />S:\Projects\1125G Squaw Gulch Valley Leach Facililty Design\I - Tech Specs\01400.2.r0.doc <br /> establish testing protocols and procedures for correcting and documenting construction <br />deficiencies; <br /> discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design; and <br /> This meeting will be documented by the MANAGER or his designee and copies distributed <br />to all parties. <br />5.02 PROGRESS MEETINGS: <br /> The MANAGER will hold a daily progress meeting, either before the start of work or at the completion of <br />work. At a minimum, this meeting will be attended by the CQA Monitor, INSTALLER and <br />CONTRACTOR. The purpose of this meeting will be to: <br /> review all the previous day's accomplishments and activities; <br /> review scheduled work location and activities for the day; and, <br /> discuss any problems or potential construction problems. <br /> This meeting will be documented by the CQA Monitor. <br />5.03 DEFICIENCY MEETINGS: <br /> Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a minimum, <br />these meetings will be attended by the CQA Monitor and INSTALLER or CONTRACTOR. If the <br />problem relates to a design issue, the MANAGER, DESIGN ENGINEER and CERTIFYING <br />ENGINEER should also be present. The meeting will be documented by the CQA Monitor. <br />PART 6.0 GEOSYNTHETICS CONSTRUCTION QUALITY ASSURANCE <br /> Construction of the valley leach facility or specified geosynthetics must be in compliance with the design <br />plans and SPECIFICATIONS. CC&V shall implement a CQA monitoring and testing program to ensure <br />construction compliance by the CONTRACTOR. The quality assurance program shall consist of <br />reviewing CONTRACTOR quality control submittals, material conformance testing, construction <br />monitoring and testing. <br /> The types of geosynthetics used in the valley leach facility construction include polyethylene pipe, <br />geomembrane and geotextile. These geosynthetics are defined in the project SPECIFICATIONS. Prior to <br />and during construction, these geosynthetics shall be sampled and tested to determine if they meet project <br />SPECIFICATIONS. All tests shall be performed in a geosynthetics laboratory approved by the <br />MANAGER and CERTIFYING ENGINEER. <br />6.01 REVIEW QUALITY CONTROL SUBMITTALS: <br /> Prior to geosynthetic installation, the CQA Monitor shall review the INSTALLER'S quality control <br />submittals to evaluate or confirm that these materials meet project requirements. The CQA Monitor shall <br />review the QC submittals that are outlined in Section 2776 (Geomembrane) and Section 02777 (Geotextile) <br />of the SPECIFICATIONS.