My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-14_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-14_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:33 PM
Creation date
1/15/2016 3:17:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
1/14/2016
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Section 01400.2 Page 3 of 11 January 14, 2011 <br />Geosynthetic CQA Plan Revision 0 <br /> <br />S:\Projects\1125G Squaw Gulch Valley Leach Facililty Design\I - Tech Specs\01400.2.r0.doc <br /> obtain and test geosynthetic conformance samples during geosynthetics manufacture; <br /> observe prepared subgrade prior to geosynthetic deployment; <br /> monitor and document geosynthetic material placement, trial seam testing, non-destructive <br />testing, seaming and repair operations, and destructive testing; <br /> identify seam samples for CQA destructive testing; <br /> assure that testing equipment used, and tests performed are conducted according to project <br />SPECIFICATIONS and industry standards; <br /> perform or observe, document, and report test results to MANAGER as required; <br /> report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA <br />Monitor, including design or project SPECIFICATION changes; and <br /> prepare a Construction Certification Report describing the construction, any deviations from <br />SPECIFICATIONS or, DRAWINGS and details, details of all field and laboratory details, <br />subgrade acceptance forms, test data, tests results (both laboratory and field), QC submittals, <br />geomembrane panel layout as-built prepared by the CQA Monitor, professional certification <br />that construction was completed in compliance with the DRAWINGS and <br />SPECIFICATIONS. The report will be signed and sealed by the CERTIFYING <br />ENGINEER registered in the State of Colorado. <br />2.06 GEOSYNTHETICS MANUFACTURER: <br /> The Geosynthetics Manufacturer, also referred to as the "MANUFACTURER", is responsible for <br />production of the geosynthetic components outlined in this plan. Each MANUFACTURER must verify <br />prior to construction that the MANUFACTURER can produce material that meets the requirements <br />outlined in project SPECIFICATIONS. <br />2.07 GEOSYNTHETICS INSTALLATION CONTRACTOR: <br /> The Geosynthetics Installation Contractor, also referred to as the "CONTRACTOR" or "INSTALLER", <br />is responsible for installation of the geosynthetic components, as outlined in the project <br />SPECIFICATIONS. <br /> The INSTALLER must meet the requirements outlined in the project SPECIFICATIONS. <br /> The INSTALLER will be responsible for storage, handling, deploying, temporary geomembrane <br />anchoring, seaming, repairs and non-destructive testing, in accordance with the project plans, <br />SPECIFICATIONS and the INSTALLER's internal quality control program. It is the INSTALLER's <br />responsibility to see that all submittals are received as outlined in the project SPECIFICATIONS. <br />2.08 EARTHWORKS CONTRACTOR: <br /> The Earthworks Contractor, also referred to as "CONTRACTOR" is responsible for proper delivery and <br />placement of earthwork components as outlined in the project SPECIFICATIONS.
The URL can be used to link to this page
Your browser does not support the video tag.