2016-01-14_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-14_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:33 PM
Creation date
1/15/2016 3:17:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
1/14/2016
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Section 01400.1 Page 4 of 10 January 14, 2011 <br />Earthworks CQA Plan Revision 0 <br /> <br />S:\Projects\1125G Squaw Gulch Valley Leach Facililty Design\I - Tech Specs\01400.1.r0.doc <br /> <br />PART 5: MEETINGS <br /> This section identifies and describes the meetings to be held during the course of the construction. Meetings <br />shall be held in order to clearly define construction activities and goals in order to facilitate construction. <br />5.01 PRECONSTRUCTION MEETING: <br /> MANAGER will hold a preconstruction meeting at the site prior to the start of construction. MANAGER, <br />DESIGN ENGINEER, CERTIFYING ENGINEER, CQA Monitor, CONTRACTOR, and others <br />designated by MANAGER shall attend this meeting. The purpose of this meeting will be to: <br /> review the construction DRAWINGS, CQA Plan, and SPECIFICATIONS; <br /> define the responsibilities of each party; <br /> define lines of communication and authority; <br /> review method of documentation, testing procedures, and reporting inspection data; <br /> establish testing protocols and procedures for correcting and documenting construction <br />deficiencies; <br /> discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design; and <br /> This meeting will be documented by MANAGER and copies will be distributed to all parties. <br />5.02 PROGRESS MEETINGS: <br /> MANAGER will hold a daily progress meeting, either before the start of work or at the completion of work. <br />At a minimum, this meeting will be attended by the CQA Monitor and CONTRACTOR. The purpose of this <br />meeting will be to: <br /> review all the previous day's accomplishments and activities; <br /> review scheduled work location and activities for the day; <br /> discuss any problems or potential construction problems; and, <br /> review test data. <br />5.03 DEFICIENCY MEETINGS: <br /> Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a minimum, these <br />meetings will be attended by the CQA Monitor and CONTRACTOR. If the problem relates to a design <br />issue, MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER should also be present. The <br />meeting will be documented by the CQA Monitor.
The URL can be used to link to this page
Your browser does not support the video tag.