Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) <br />SQUAW GULCH (VLF) WEEKLY REPORT <br />Subgrade: <br />Phase 1 areas dozed to finished grade were compacted per project plans and specifications. <br />See attached figure for approved subgrade. <br />Soil Liner Fill: <br />A Cat smooth drum roller, a Cat excavator and a water truck conditioned and compacted SLF <br />prior to geomembrane deployment. <br />Cat 777 haul trucks transported SLF from the Cameron to station L4+00 and J0+00. SLF was <br />stockpiled on the L Bench and the J Bench. A Cat dozer constructed a temporary SLF road <br />between stations L4+00 and H29+00. <br />Cat 740 haul trucks transported SLF from the Cameron to station H8+00.Cat dozers placed SLF <br />above stations F8+00 to F12+00. A Cat excavator with roller attachment compacted the SLF <br />surface. <br />Cat dozers placed SLF above stations F10+00 to F14+00. Two Cat smooth drum rollers <br />(connected by cable to thrust block) compacted SLF below stations H2+00 to H4+00. <br />Cat 740 haul trucks transported SLF to station 63+00 of the ADR Haul Road. A Cat dozer <br />constructed a temporary SLF road towards station H14+00.Cat dozers placed SLF between <br />stations H6+00 to H8+00. A Cat excavator reworked the bench in the vicinity of station H16+00. <br />Cameron SLF processing continued. <br />All of the above Soil Liner Fill material was placed,graded, and compacted per the project plans <br />and specifications.Moisture content, density testing and depth verification were performed per <br />project specification prior to surface acceptance and geomembrane installation. <br />See attached figure for approved SLF. <br />Drain Cover Fill: <br />Cat 740 haul trucks transported DCF from the stockpile to Phase 1.Low ground pressure Cat <br />dozers placed DCF on approved geomembrane in Phase 1. <br />See attached figure for approved DCF. <br />Spent Ore Fill: <br />A Cat dozer continued placement of Spent Ore to engulf the open water in the PSSA prior to <br />scheduled loading of Crushed Ore in the Fourth Quarter 2015. <br />Crushed Ore Fill: <br />Cat 793 haul trucks delivered Crushed Ore between stations 18+00 to 23+00 of the ADR haul <br />road. The Crushed Ore was used to continue construction of the 20’ haul road for access to the <br />PSSA.