My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-14_REPORT - M1980244 (10)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-14_REPORT - M1980244 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:32 PM
Creation date
1/15/2016 2:48:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
1/14/2016
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) <br />SQUAW GULCH (VLF) WEEKLY REPORT <br />Subgrade: <br />Phase 1 areas dozed to finished grade were compacted per project plans and specifications. <br />See attached figure for approved subgrade. <br />Soil Liner Fill: <br />A Cat smooth drum roller, a Cat excavator and a water truck conditioned and compacted SLF <br />prior to geomembrane deployment. <br />Cat 777 haul trucks transported SLF from the Cameron to station L4+00 and J0+00. SLF was <br />stockpiled on the L Bench and the J Bench. A Cat dozer constructed a temporary SLF road <br />between stations L4+00 and H29+00. <br />Cat 740 haul trucks transported SLF from the Cameron to station H8+00.Cat dozers placed SLF <br />above stations F8+00 to F12+00. A Cat excavator with roller attachment compacted the SLF <br />surface. <br />Cat dozers placed SLF above stations F10+00 to F14+00. Two Cat smooth drum rollers <br />(connected by cable to thrust block) compacted SLF below stations H2+00 to H4+00. <br />Cat 740 haul trucks transported SLF to station 63+00 of the ADR Haul Road. A Cat dozer <br />constructed a temporary SLF road towards station H14+00.Cat dozers placed SLF between <br />stations H6+00 to H8+00. A Cat excavator reworked the bench in the vicinity of station H16+00. <br />Cameron SLF processing continued. <br />All of the above Soil Liner Fill material was placed,graded, and compacted per the project plans <br />and specifications.Moisture content, density testing and depth verification were performed per <br />project specification prior to surface acceptance and geomembrane installation. <br />See attached figure for approved SLF. <br />Drain Cover Fill: <br />Cat 740 haul trucks transported DCF from the stockpile to Phase 1.Low ground pressure Cat <br />dozers placed DCF on approved geomembrane in Phase 1. <br />See attached figure for approved DCF. <br />Spent Ore Fill: <br />A Cat dozer continued placement of Spent Ore to engulf the open water in the PSSA prior to <br />scheduled loading of Crushed Ore in the Fourth Quarter 2015. <br />Crushed Ore Fill: <br />Cat 793 haul trucks delivered Crushed Ore between stations 18+00 to 23+00 of the ADR haul <br />road. The Crushed Ore was used to continue construction of the 20’ haul road for access to the <br />PSSA.
The URL can be used to link to this page
Your browser does not support the video tag.