Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) <br />SQUAW GULCH (VLF) WEEKLY REPORT <br />Owner:Cripple Creek & Victor Gold Mining Co.Project Number:74201125N0 <br />Project:Squaw Gulch Valley Leach Fill (VLF)Week Ending:October 3, 2015 <br />Location:Cripple Creek & Victor Gold Mine, CO <br />Contractor:Ames Construction, Inc. <br />Reporting Period:9.27.2015 through 10.03.2015 <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs:57°F to 72°F Cloud Cover:Partly Cloudy to Mostly Cloudy <br />Lows:40°F to 48°F Precipitation:Rain <br />Wind:Calm to moderate <br />Ames:Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning:Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />I)Earthworks <br />A)VLF (PSSA,Phase 1,and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />Cat dozers graded the slope between stations F10+00 to F12+00 and H8+00 to H10+00. A Cat <br />excavator with a smooth drum roller attachment compacted the fill areas. <br />Cat dozers graded the slope above station 60+00 of the ADR haul road. Cat 740 haul trucks <br />hauled spoils from station 60+00 to J2+00. Cat dozers placed structural fill in the vicinity of J <br />Bench. A Cat smooth drum roller compacted the fill areas. <br />Cat 740 haul trucks hauled Structural Fill to the fill area above stations F24+00. A Cat D8 dozer <br />placed Structural Fill upslope from stations F24+00 to F26+00. A Cat loader placed Structural Fill <br />above station F18+00. A Cat smooth drum roller compacted the fill area. <br />CC&V hauled material to the Dump 4 surge in Phase 2 using Cat 793 haul trucks. A Cat dozer <br />placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum roller <br />compacted the fill area. <br />All of the above Structural Fill material was placed,compacted, and graded per the project plans <br />and specifications. <br />Days S M T W T F S <br />Work Shifts D D D D D D <br />D=Day Shift N=Night Shift W=Weather