Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) <br />SQUAW GULCH (VLF) WEEKLY REPORT <br />Owner:Cripple Creek & Victor Gold Mining Co.Project Number:74201125N0 <br />Project:Squaw Gulch Valley Leach Fill (VLF)Week Ending:October 10, 2015 <br />Location:Cripple Creek & Victor Gold Mine, CO <br />Contractor:Ames Construction, Inc. <br />Reporting Period:10.4.2015 through 10.10.2015 <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs:53°F to 67°F Cloud Cover:Partly Cloudy to Mostly Cloudy <br />Lows:35°F to 45°F Precipitation:Rain <br />Wind:Calm to moderate <br />Ames:Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning:Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />I)Earthworks <br />A)VLF (PSSA,Phase 1,and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />A Cat dozer placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum <br />roller compacted the fill area. <br />A Cat loader placed Structural Fill near station F15+00. A Cat smooth drum roller compacted the <br />fill area. <br />Cat dozers graded subgrade above stations J10+00 to J12+00 in the vicinity of L Bench. <br />A Cat excavator loaded Cat 740 haul trucks with spoils from station H29+00. The material was <br />transported to fill locations between stations H23+00 and H24+00. A Cat dozer placed the <br />Structural Fill and a Cat smooth drum roller compacted the fill area. <br />All of the above Structural Fill material was placed,compacted, and graded per the project plans <br />and specifications. <br />Subgrade: <br />Phase 1 areas dozed to finished grade were compacted per project plans and specifications. <br />Days S M T W T F S <br />Work Shifts D D D D D D <br />D=Day Shift N=Night Shift W=Weather