My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-14_REPORT - M1980244 (16)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-14_REPORT - M1980244 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:32 PM
Creation date
1/15/2016 2:29:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
1/14/2016
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br />Cripple Creek & Victor Gold Mining Company <br />Phase 1 Squaw Gulch Valley Leach Facility-Phase1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Fill Temperature Monitoring Summary <br />DATE TIME OF <br />TEST <br />AMBIENT <br />TEMPERATURE <br />(°F) <br />AVERAGE FILL <br />TEMPERATURE <br />(°F) <br />LOCATION <br />8:00 AM 35 33 SLF Station H21+00 to H26+00 9650' at 9750' Bench <br />9:07 AM 42 33 Fusion welding began, panel deployed approx. 8:50 am <br />1:00 PM 45 33 SLF Station H21+00 to H26+00 9650' at 9750' Bench <br />2:30 PM 48 35 SLF Station H21+00 to H26+00 9650' at 9750' Bench <br />2:30 PM 50 35 SLF Station H21+00 to H26+00 9650' at 9750' Bench <br />4:30 PM 43 >33 Fusion welding of last liner seam of the day began <br />7:30 AM 28 >33 SLF Station H21+00 to H24+00 9650' at 9750' Bench <br />8:30 AM 29 >33 SLF Station H21+00 to H24+00 9650' at 9750' Bench <br />9:30 AM 33 >33 SLF Station H21+00 to H24+00 9650' at 9750' Bench <br />10:30 AM 35 >33 SLF Station H21+00 to H24+00 9650' at 9750' Bench <br />11:00 AM 38 >33 SLF Station H21+00 to H24+00 9650' at 9750' Bench <br />11:30 AM 40 33 SLF Station H21+00 to H24+00 9650' at 9750' Bench <br />1:30 PM 41 46 SLF Station H21+00 to H24+00 9650' at 9750' Bench <br />2:30 PM 42 45 SLF Station H21+00 to H24+00 9650' at 9750' Bench <br />4:00 PM 42 38 Fusion welding began, panel deployed approx. 4:33 pm <br />5:30 PM 38 34 SLF Station H21+00 to H24+00 9650' at 9750' Bench <br />7:00 PM 34 33 SLF Station H21+00 to H24+00 9650' at 9750' Bench <br />8:00 PM 32 >33 Fusion welding of last liner seam of the day began <br />12/11/2015 DCF Placement only <br />12/14/2015 DCF Placement only <br />* SLF and Geomembrane Placed at this time is not certified with this report, it will be certified in the next ROC report. <br />12/10/2015* <br />12/9/2015* <br />Page 2 of 2
The URL can be used to link to this page
Your browser does not support the video tag.