Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch VLF Phase 1 <br />(9,550-foot Elevation Bench to Geomembrane Panel P1635) <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 2016 <br /> iv <br />L IST OF T ABLES <br />Table <br />No. Title <br />1 Summary of Weather Data <br />2 Fill Temperature Monitoring Summary <br />3 Summary of Earthworks Material Specifications <br />4 CQA Earthworks Testing Summary & Testing Frequency <br />5 CQA Earthworks Laboratory Testing Summary-Structural Fill <br />6 CQA Earthworks Laboratory Testing Summary-Select Structural Fill <br />7 CQA Earthworks Laboratory Testing Summary-Leak Detection Fill <br />8 CQA Earthworks Laboratory Testing Summary-Underdrain Fill <br />9 CQA Earthworks Laboratory Testing Summary-Soil Liner Fill <br />10 CQA Earthworks Laboratory Testing Summary-Drain Cover Fill <br />11 Nuclear Gauge Moisture-Density Testing Summary-Soil Liner Fill <br />12 Soil Liner Fill Depth Verification Summary <br /> <br /> <br />L IST OF F IGURES <br />Figure No. Title <br />1 Site Location <br />2 Construction & Geomembrane Installation Limits <br />3 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br />4 Destructive Sample Test Codes for Extrusion Welds with Leister Heat Seams <br /> <br /> <br />