My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-14_REPORT - M1980244 (15)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-14_REPORT - M1980244 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:32 PM
Creation date
1/15/2016 2:27:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
1/14/2016
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch VLF Phase 1 <br />(9,550-foot Elevation Bench to Geomembrane Panel P1635) <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 2016 <br />Project No.: 74201125N0 Page 8 <br />• John Deere 35D Excavator <br />• Caterpillar 312 Excavator <br />• John Deere 200 Excavator <br />• Caterpillar 304 Excavator <br />• Caterpillar 330 Excavator <br />• Caterpillar 345 Excavator <br />• Caterpillar 375 Excavator <br />• Caterpillar 385 Excavator <br />• John Deere 850 Excavator <br />• John Deere 120 Excavator <br />• Tamrock Track Mounted Drill <br />• Sandvik Track Mounted Drill <br />• Caterpillar 740 Haul Truck <br />• Caterpillar 777 Haul Truck <br />• Water Trucks <br />Weather data for the Project construction activities from the period of end-September <br />2015 through end of Project construction in end-November 2015 are presented in <br />Table 1. <br />2.1 Underground Workings Remediation <br />All underground workings remediation within the Phase 1 Project boundary were <br />reported in the Squaw Gulch VLF Phase 1 (9,450’ to 9,550’ Bench) Record of <br />Construction report submitted November 2015. <br />2.2 Underdrains <br /> Secondary Underdrain System <br />Ames constructed approximately 2,353 linear feet of secondary underdrain. Record <br />Drawing No. 3 shows the location of the secondary underdrain system. Details of the <br />secondary underdrain system can be found on IFC Drawing A250 and a plan view of <br />the locations within the Project on IFC Drawing A200. The cross-section dimension of <br />the secondary underdrain was 4 feet wide by 2 feet deep, providing a cross-sectional <br />area of 8 square feet as shown on IFC Drawing A250. Ames excavated each secondary <br />underdrain trench to the minimum dimensions, and placed geotextile and UF in the
The URL can be used to link to this page
Your browser does not support the video tag.