Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch VLF Phase 1 <br />(9,550-foot Elevation Bench to Geomembrane Panel P1635) <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 2016 <br /> vii <br />Appendix J.4 80-mil LLDPE DSMS Geomembrane Defect/Repair Summary <br />Appendix J.5 80-mil LLDPE DSMS Geomembrane Fusion & Extrusion <br />Destructive Testing Summary <br />Appendix J.6 80-mil LLDPE DSMS Geomembrane Non-Destructive Testing <br />Summary <br />Appendix J.7 80-mil LLDPE DSMS Geomembrane Acceptance Notifications <br />Appendix K Geomembrane Third Party Conformance Test Results <br />Appendix K.1 80-mil LLDPE DSMS Geomembrane Conformance Test Results <br />Appendix K.2 40-mil LLDPE Smooth Geomembrane Conformance Test Results <br />Appendix L Tensiometer Certifications <br />Appendix M Underdrain Pond Geomembrane Installation Observations and Documentation <br />Appendix M.1 Geosynthetic Clay Liner Panel Record of Construction Drawing <br />Appendix M.2 Geosynthetic Clay Liner Manufacturing Product Certifications <br />Appendix M.3 80-mil LLDPE DSMS Geomembrane Panel Record of <br />Construction Drawing <br />Appendix M.4 80-mil LLDPE DSMS Geomembrane Installation Observations <br />Appendix M.5 80-mil LLDPE DSMS Geomembrane Roll Quality Control <br />Certificates <br />Appendix M.6 Underdrain Pond Lining Response Letter <br />Appendix N Technical Specification Deviation Letter <br /> <br /> <br /> <br />