Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch VLF Phase 1 <br />(9,550-foot Elevation Bench to Geomembrane Panel P1635) <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 2016 <br /> v <br />L IST OF ISSUED FOR CONST RUCT ION DR AWIN GS <br />1 <br />Drawing Title <br />A000 VLF Title Sheet <br />A20 Existing Site Conditions <br />A25 Geotechnical Investigation <br />A40 Site Geology Map <br />A80 Soil Liner Fill Borrow Area Sheet 1 of 2 <br />A82 Soil Liner Fill Borrow Area Isopach <br />A85 Soil Liner Fill Borrow Area Sheet 2 of 2 <br />A200 Phase 1 Squaw Gulch Grading Plan <br />A201 Phase 1 Squaw Gulch Grading Plan Isopach <br />A202 Phase 1 Grading Alignment Plan View <br />A203 Phase 1 Grading Horizontal Alignment Data <br />A215 Overall Liner Limits <br />A220 Valley Leach Facility Sections and Details Sheet 1 of 2 <br />A230 Valley Leach Facility Sections and Details Sheet 2 of 2 <br />A240 Haul Road Plan and Profile Sheet 1 of 4 <br />A241 Haul Road Plan and Profile Sheet 2 of 4 <br />A242 Haul Road Plan and Profile Sheet 3 of 4 <br />A243 Haul Road Plan and Profile Sheet 4 of 4 <br />A244 South Perimeter Road Plan and Profile <br />A245 West Perimeter Road Phase 1 Plan and Profile <br />A250 Underdrain Details Sheet 1 of 2 <br />A260 Leak Detection and Typical Erosion Control Details <br />A400 High Volume Solution Collection Piping Layout <br />A410 High Volume Solution Collection System Details <br /> <br />1 Only drawings relevant to Squaw Gulch VLF Phase 1 Construction