Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Prepared For: <br /> <br />Cripple Creek & Victor Gold Mining Company <br />Post Office Box 191 <br />100 North 3rd Street <br />Victor, Colorado 80860 <br />Telephone: 719.689.4242 <br /> <br /> <br />Prepared By: <br /> <br />Amec Foster Wheeler <br />2000 South Colorado Boulevard <br />Suite 2-1000 <br />Denver, Colorado 80222 <br />Telephone: 303.935.6505 <br /> <br />Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch VLF Phase 1 <br />(9,550-foot Elevation Bench to Completed Areas Outlined on Figure 2) <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 2016