a <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. I" <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />UG #6510: Excavated 15+/- feet to competent rock. Backfilled and compacted per <br />project specifications. Remediated. T&M = Cat 336 — 5.0 hours. <br />UG #6477: Excavated 15+/- feet. Encountered rail and timbers. Provided drill access. <br />Further remediation required. T&M = Cat 336 — 5.0 hours. <br />UG #6468: Poured concrete plug. Further remediation required. <br />UG #6678: Poured concrete plug. Further remediation required. <br />UG #6542: Poured concrete plug. Further remediation required. <br />UG #6673: A Cat 336 backfilled to geogrid subgrade elevation. Further remediation <br />required. <br />UG #6471: A Cat 330 excavator removed timber, debris and approximately 120 feet of <br />vertical pipe. Further remediation required. <br />UG #6476: Excavated 8+/- feet to competent rock. Backfilled and compacted per project <br />specifications. Remediated. T&M = Cat 336 —1.5 hours. <br />UG #6526: Excavated 15+/- feet to competent rock. Backfilled and compacted per <br />project specifications. Remediated. T&M = Cat 336 — 4.5 hours. <br />UG #6652: Excavated 6+/- feet to competent rock. Backfilled and compacted per project <br />specifications. Remediated. T&M = Cat 336 — 3.0 hours. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: None. <br />Tertiary Underdrain: None. <br />Leak Detection: <br />None. <br />Geomembrane: <br />Geomembrane installation within Phase 1 continued this week performing deployment, seaming, <br />repair, and QA/QC activities. Approximately 120,586 square feet of 80mi1 LLDPE geomembrane <br />was deployed. Soil Liner Fill was inspected and approved by AMEC, Ames and ECA <br />representatives prior to geomembrane deployment. Approximately 6,033 linear feet of seam was <br />fusion welded during deployment using one or two fusion welding machines for each day of <br />deployment. Approximately 400 linear feet of extrusion welding was completed during this <br />period. Destructive and non-destructive testing was completed in compliance with project <br />technical specifications. <br />Ames continuously excavated anchor trench ahead of geomembrane installation. After <br />geomembrane testing was completed, the anchor trench above finished panels was backfilled <br />and compacted per project specifications. <br />See attached figure for approved geomembrane. <br />