Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. *I1 <br />(COLORADO) ASHANTI ( ) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />I) Field Activities: <br />The following activities were observed: Underground Working remediation; Drain Cover Fill placement; <br />and pump monitoring at the LVSCS riser pipes. <br />II) Laboratory Activities: <br />Concrete testing (ADR2), atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. <br />General Prolect Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held December 15, 2015 (Amec Foster Wheeler, CC&V, Ames). <br />Amec Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br />Contractor Meeting. <br />➢ Ames daily safety meetings <br />➢ Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler, and Ames. <br />Deliveries: Ames received 96 rolls of Tensar UX1800-HS Uniaxial HDPE Geogrid. <br />CQA Monitor <br />Submitted by: <br />Bobby Redd, El <br />Project Resident <br />Date: January 05, 2016 <br />Reviewed by: Date: <br />CC&V Projects <br />Reviewed By: '�� Date: 1,41, <br />Reviewed By: Date: <br />