My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-13_REPORT - C2009087
DRMS
>
Day Forward
>
Report
>
Coal
>
C2009087
>
2016-01-13_REPORT - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 11:32:21 AM
Creation date
1/13/2016 2:03:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Report
Doc Date
1/13/2016
From
DRMS
To
Peabody Sage Creek Mining, LLC
Annual Report Year
2014
Permit Index Doc Type
Hydrology Report
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peabody Sage Creek Mining, LLC <br />Page 2 <br />12/14/2015 <br />Review of Annual Hydrology Report <br />Mine: Peabody Sage Creek Mine Date Reviewed: December 10-14, 2015 <br />Permit No: C-2009-087 Reviewed By: Jared Ebert <br />Report Year: 2014 <br />Submitted By: Peabody Sage Creek Mining, LLC. (PSCM) <br />Date Received: March 6, 2015 <br />Requirement <br />Requirement citation <br />Comment <br />1. Filing frequency of <br />CDRMS regulation <br />The annual hydrology Report is required to be submitted <br />hydrology report <br />4.05.13(4)(c) <br />yearly. <br />2. Timely filing of <br />Volume 1, p. 2.04-103 <br />The Annual hydrology Report is required to be submitted <br />hydrology report <br />of CDRMS mining <br />by March 1 and was received by the Division via email <br />permit C-2009-087 <br />on March 6, 2015. PSCM requested an extension of time <br />to submit the AHR by March 6, 2015, and the Division <br />approved that request. <br />3. Filing frequency of <br />NPDES permit COG- <br />The Division received copies of DMRs. All filing dates <br />NPDES Discharge <br />0048275 <br />were met. <br />Monitoring Reports <br />4. Timely filing of <br />NPDES permit COG- <br />The Division received copies of DMRs. All filing dates <br />Discharge Monitoring <br />0048275 <br />were met. <br />Reports <br />5. Sampling frequency <br />NPDES permit COG- <br />All NPDES discharge points are monitored monthly for <br />of NPDES outfalls <br />0048275 <br />field parameters and lab parameters. <br />6. Parameters to be <br />NPDES permit COG- <br />Field parameters include: flow, temperature, pH, and <br />sampled for NPDES <br />0048275 <br />conductivity. <br />reporting <br />7. NPDES discharge <br />NPDES permit COG- <br />NPDES Sites 003, 002, and 004 were previously <br />limitations <br />0048275 <br />permitted under COG -0000221. CO -0048275 was issued <br />and in effect as of June 7, 2010. <br />
The URL can be used to link to this page
Your browser does not support the video tag.