Laserfiche WebLink
Peabody Sage Creek Mining, LLC <br />Page 9 <br />12/14/2015 <br />24. Agreement of <br />CDRMS regulation <br />Due to limited on the ground construction activities <br />observed hydrologic <br />2.05.6(3) and <br />during the 2014 water year, a determination cannot be <br />impacts with "probable <br />requirement to keep <br />made as to the impacts with the approved PHC. Based <br />hydrologic <br />current, CDRMS <br />on the current activities and observations in the 2014 <br />consequences" projected <br />regulation 2.03.3(1) <br />AHR, no local or regional impacts were identified. This <br />in mining <br />observation is consistent with the PHC. <br />25. Adequacy of <br />CDRMS regulation <br />The current ground water monitoring program continues <br />ground water <br />4.05.13(1) <br />to adequately address the protection of the hydrologic <br />monitoring program <br />balance. <br />26. Adequacy of <br />CDRMS regulation <br />The current surface water monitoring program continues <br />surface water <br />4.05.13(2) <br />to adequately address the protection of the hydrologic <br />monitoring program <br />balance. <br />