Laserfiche WebLink
.' \t ( a� RECEIVED <br /> JAN 12 2016 <br /> ‘\1(), <br /> �` Page 2 of 3 <br /> //" DMSION CF RECLAMATION, <br /> ' \ / ...4. 1 i 6 0-4,, poi - J� 112c Annual Report <br /> Permittee Name: olorado Department of Transportation Permit Number: M-1979-142 <br /> Operation Name: West of Maybell Pit _ County: Moffat <br /> Annual Fee Due: $791.00 Anniversary Date: February 1,2015 <br /> Permit Acreage: 39.50 Current Bond Amt: 1 $0.00 <br /> According to C.R.S. 34-32.5-116 or 34-32-116,each year,on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee,an Annual Report and map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year,any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act,it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). ____S____±_ NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES NO <br /> ---,--- <br /> If <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? r- ' l -- <br /> 5. Does the mine operate more than 180 days per year YES 6CT______) <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? YES NO <br /> b)approval for INTERMITTENT OPERATION? YES NO <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). �C'l SC., <br /> 8. Number of acres that were newly affected during the current report year. --f7- <br /> 9. Number of acres that were reclaimed during the current report year. <br /> 10. Estimated new acreage to be affected in the next report year. <br /> 11. Estimated acres to be reclaimed in the next report year. `-e"- <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ w/topsoil mulched w/ <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: fertilized w/ replacement rate(tons): <br /> apvd fertilizer: depth(in.): _ <br /> Seed Fertilizer Mulch <br /> application application application <br /> method: method: method: <br />