Laserfiche WebLink
2015 Annual Report <br />Martin Marietta <br />Parkdale Project <br />Permit # M-1997-054 <br />Page 2 of 5 <br />7. Number of acres currently affected (mining+ incomplete and or unreleased reclamation): <br />8. Number of acres that were newly affected during the current report year: <br />9. Number of acres that were reclaimed during the current report year: <br />10_ Estimated new acreage to be affected in the next report year: <br />11. Estimated acres to be reclaimed in the next report year: <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />93 <br />0 <br />0 <br />0 <br />0 <br />Total acres <br />backfilled: <br />0 <br />Total acres <br />seeded w/ <br />approved mix: <br />0 <br />Total acres <br />w/topsoil <br />replaced: <br />0 <br />Total acres <br />mulched w/ <br />approved mulch: <br />0 <br />Total acres <br />graded: <br />0 <br />Total acres <br />fertilized w/ <br />apvd fertilizer: <br />0 <br />Topsoil <br />replacement <br />depth (in.): <br />0 <br />Mulch application <br />rate (tons/ac): <br />0 <br />Seed <br />application <br />method: <br />N/A <br />Fertilizer <br />application <br />method: <br />N/A <br />Mulch <br />application <br />method: <br />N/A <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? <br />If "YES", indicate the weed species, control area, control type, application rate and treatment da e on the report map. <br />NO N/A <br />14.Is adequate topsoil reserved for reclamation, based on your approved permit? <br />If "NO", please explain: <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? <br />If 'NO' please explain: <br />NO N/A <br />NO N/A <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining plan an. Office of the State <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? NO N/A <br />17. Are all hazardous materials stored within approved spill containment structures? fir NO N/A <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? ® NO N/A <br />19. Is your basis for legal right to enter still valid? co NO <br />20. Does your permit require you to submit monitoring information annually? YES N/A <br />If "Yes", please attach the required monitoring results to this Annual Report. <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R.S. 34-32-1 16 or 34-32.5-116), attach a map to this report that accurately depicts the permit <br />boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. <br />UPDATED MAP ATTACHED: YES <br />