Laserfiche WebLink
Reclamation J&T Consulting, Inc. <br />�p,a�t� <br />ReclamaBond Quantities and Costs <br />© 2014 JaT Cement's. Ise. <br />Loloff Construction <br />Loloff Mine <br />12/22/2014 <br />Bond Calc with 1 GIC Share and 1 New Cache Share <br />Summary of Unit Costs <br />Direct costs <br />Scanfying Ground <br />Re -applying topsoil 12" thick <br />Revegetating/Seeding disturbed area <br />Mobilization <br />Slunv Wall Cost Breakdown (0-50 ft $3/ft - 51-70 ft CtD $4/ft <br />Slurry Wall Cost (45 to 50 foot average depth) <br />Overhead and Profit Costs <br />Liability insurance <br />Performance bond <br />Profit <br />Proiect Manaaement <br />Engineenng and bidding <br />Management and administration <br />Total Overhead Cost <br />Total Additional Cost <br />200 <br />2,000 <br />1,000 <br />2,500 <br />/ acre <br />/ acre <br />/ acre <br />lump sum <br />$ 135 /linear foot <br />1 55% of direct cost <br />1 05% of direct cost <br />10.00% of direct cost <br />12.60% of direct cost <br />4 25% of direct cost <br />5 00% of direct cost <br />9.25% of direct cost <br />Phase 1 (5.8 acres) (Area that has 1 GIC share and 1 New Cache share to cover permanent augmentation) <br />(Reclamation Operation <br />Quantity Unit Unit Cost <br />Cost <br />Active Mining Area (Part of Existing Exposed Ground Water Areal <br />Scarifying Ground in Disturbed Area <br />Topsoil Placement in Disturbed Area <br />Revegetate Disturbed Area <br />Mobilization <br />ac <br />ac <br />ac <br />Is <br />$ 200 $ <br />$ 2,000 $ <br />$ 1,000 $ <br />$ 2,500 $ <br />Total Direct Cost $ <br />Overhead and Profit Cost (12.60%) $ <br />Contract Cost $ <br />Project Management (9 25%) $ <br />Total Required Financial Warranty For Phase 1 <br />1 of 2 <br />