Laserfiche WebLink
PART I <br />Page 22 of 48 <br />Permit No.: C00038342 <br />iii. Spill Prevention and Response Procedures - Procedures for preventing, responding to, and reporting <br />spills and leaks. The permittee may reference other plans (e.g., a Spill Prevention Control and <br />Countermeasure (SPCC) plan) otherwise required by a permit for the facility, provided that a copy of <br />the other plan is kept onsite with the SWMP, and made available for review consistent with SWMP <br />Requirements. <br />iv. Employee Training - A schedule for all types of training required by this permit, content of the training, <br />and log of the dates on which specific employees received training. <br />v. Non-Stormwater Discharges - Documentation of the stormwater conveyance system evaluation for the <br />presence of non-stormwater discharges not authorized in this permit, and the elimination of all <br />unauthorized discharges. Documentation of the evaluation must include: <br />a) The date of any evaluation; <br />b) A description of the evaluation criteria used; <br />c) A list of the outfalls or onsite drainage points that were directly observed during the evaluation; <br />d) The different types of non-stormwater discharge(s) and source locations; and <br />e) The action(s) taken, such as a list of control measures used to eliminate unauthorized discharge(s), <br />if any were identified. <br />g. Inspection Procedures and Documentation: The permittee shall document inspection procedures, and <br />maintain such procedures and other documentation with the SWMP, as follows: <br />i. The permittee shall document procedures for performing the facility inspections required of the permit <br />(see INSPECTIONS). Procedures must identify: <br />a) Person(s) or positions of person(s) responsible for inspection; <br />b) Schedules for conducting inspections; and <br />c) Specific items to be covered by the inspection, including inspection schedules for specific outfalls. <br />ii. The permittee shall maintain inspection documentation with the SWMP as required by this permit. <br />h. Monitoring Procedures and Documentation: The permittee shall document monitoring procedures, and <br />maintain such procedures and other documentation with the SWMP, as follows: <br />i. The permittee shall document procedures for performing the monitoring required by the permit. <br />ii. For each type of monitoring, procedures must identify: <br />a) Locations where samples are collected, and outfall identification by its unique identifying number; <br />b) Staff responsible for conducting stormwater sampling; <br />c) Procedures for sample collection and handling, including any deviations from sampling within the <br />first 30 minutes of a measurable storm event; <br />d) Parameters for analysis, holding times and preservatives, analytical methods, and laboratory <br />quantitation levels; <br />e) Procedures for sending samples to a laboratory; <br />f) The numeric control values applicable to discharges from each outfall. <br />i. Corrective Action Documentation: The permittee must maintain a copy of all corrective actions <br />documentation for actions taken consistent with of this permit (see CORRECTIVE ACTIONS section) with the <br />facility SWMP. <br />J. GENERAL MONITORING AND SAMPLING REQUIREMENTS <br />1. Representative Sampling <br />Samples and measurements taken for the respective identified monitoring points as required herein shall be <br />representative of the volume and nature of the monitored discharge. All samples shall be taken at the monitoring <br />points specified in this permit and, unless otherwise specified, before the effluent joins or is diluted by any other <br />