My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-03_PERMIT FILE - C1980004A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980004
>
2017-02-03_PERMIT FILE - C1980004A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2017 8:08:20 AM
Creation date
1/12/2016 7:13:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004A
IBM Index Class Name
Permit File
Doc Date
2/3/2017
Section_Exhibit Name
Appendix E List of Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 16 of 48 <br />Permit No.: C00038342 <br />Code Event Description Due Date <br />43699 <br />Facility <br />Submit a report that identifies sources of total <br />1/01/2016 <br />Evaluation Plan <br />recoverable iron to the facility and identifies strategies <br />to control these sources or treatment alternatives such <br />that compliance with the final limitations may be <br />attained. <br />00899 <br />Implementation <br />Submit a progress report summarizing the progress in <br />Schedule <br />implementing the strategies to control sources such that <br />1/01/2017 <br />compliance with the final of total recoverable iron <br />limitations may be attained. <br />CS017 <br />Achieve Final <br />Submit study results that show compliance has been <br />5/31/2018 <br />Compliance <br />attained with the final of total recoverable iron <br />limitations. <br />Regulation 61.8(3)(n)(i) states that a report should be submitted to the Division no later than 14 calendar days <br />following each date identified in the schedule of compliance. The 14 days have already been incorporated into <br />the above dates and therefore all reports are due on or before the date listed in the table. <br />F. CONTROL MEASURES (Outfalls 001, 003 and 004) <br />All control measures used by the permittee to meet the effluent limitations contained in this permit must be selected, <br />designed, installed, implemented, and maintained in accordance with good engineering hydrologic and pollution <br />control, and the manufacturer's specifications, when applicable. <br />1. Installation and implementation specifications <br />Installation and implementation specifications for each control measure type used by the permittee to meet the <br />effluent limitations contained in this permit must be retained with the SWMP (see STORMWATER MANAGEMENT <br />PLAN section). <br />2. Maintenance of Control Measures and Associated Documentation <br />a. The permittee must maintain all control measures used to achieve the effluent limits required by this <br />permit in effective operating condition. For this permit, maintenance includes preventative and routine <br />maintenance, modification, repair, replacement, or installation of new control measures. Observations <br />resulting in maintenance activities can be made during a site inspection, or during general observations of <br />site conditions. <br />b. Corrective actions associated with maintaining control measures must be conducted with due diligence, as <br />soon as possible after the need is discovered, to achieve the effluent limits required by this permit. The <br />permittee must implement interim control measures to achieve the effluent limits required by this permit <br />while performing maintenance of the primary control measure. <br />c. The permittee shall document corrective actions associated with maintaining control measures, in <br />accordance with the CORRECTIVE ACTIONS section of this permit, and shall revise the facility SWMP to <br />reflect replacement or installation of new control measures in accordance with the STORMWATER <br />MANAGEMENT PLAN section requirements. <br />G. INSPECTIONS (Outfalls 001, 003 and 004) <br />1. Inspection Frequency and Personnel <br />The permittee shall conduct and document field inspections of all drainage areas contributing runoff to the outfalls <br />referred to in this Part, as follows: <br />a. Conduct at least two comprehensive stormwater inspections per year (in spring and fall). <br />
The URL can be used to link to this page
Your browser does not support the video tag.