Laserfiche WebLink
PART I <br />Page 13 of 48 <br />Permit No.: C00038342 <br />a. General Chronic WET Testing and Reporting Requirements <br />The permittee shall conduct the chronic WET test using Ceriodaphnia dubia and Pimephales promelas, as a <br />static renewal 7 -day test using three separate grab samples. The permittee shall conduct each chronic <br />WET test in accordance with the 40 CFR Part 136 methods described in Short-term Methods for Estimating <br />the Chronic Toxicity of Effluents and Receiving Water to Freshwater Organisms, Fourth Edition, October <br />2002 (EPA -821-R-02-013) or the most current edition. <br />The following minimum dilution series should be used: 20%, 40%, 60%, 80%, and 100% effluent. If the <br />permittee uses more dilutions than prescribed, and accelerated testing is to be performed, the same <br />dilution series shall be used in the accelerated testing (if applicable) as was initially used in the failed test. <br />Tests shall be done at the frequency listed in Part I.A.2. Test results shall be reported along with the <br />Discharge Monitoring Report (DMR) submitted for the end of the reporting period when the sample was <br />taken. (i.e., WET testing results for the calendar quarter ending March 31 shall be reported with the DMR <br />due April 28, etc.) The permittee shall submit all laboratory statistical summary sheets, summaries of the <br />determination of a valid, invalid or inconclusive test, and copies of the chain of custody forms, along with <br />the DMR for the reporting period. <br />If a test is considered invalid, the permittee is required to perform additional testing during the monitoring <br />period to obtain a valid test result. Failure to obtain a valid test result during the monitoring period shall <br />result in a violation of the permit for failure to monitor. <br />b. Violations of the Permit Limit, Failure of One Test Statistical Endpoint and Division Notification <br />A chronic WET test is considered a violation of a permit limitation when both the NOEC and the IC25 are at <br />any effluent concentration less than the IWC. The IWC for this permit has been determined to be 100% <br />effluent. <br />A chronic WET test is considered to have failed one of the two statistical endpoints when either the NOEC <br />or the IC25 are at any effluent concentration less than the IWC. The IWC for this permit has been <br />determined to be 100% effluent. <br />In the event of a permit violation, or when two consecutive reporting periods have resulted in failure of <br />one of the two statistical endpoints (regardless of which statistical endpoints are failed), the permittee <br />must provide written notification to the Division. Such notification should explain whether it was a <br />violation or two consecutive failures of a single endpoint, and must indicate whether accelerated testing or <br />a Toxicity Identification Evaluation or Toxicity Reduction Evaluation (TIE or TRE) is being performed, unless <br />otherwise exempted, in writing, by the Division. Notification must be received by the Division within 14 <br />calendar days of the permittee receiving notice of the WET testing results. <br />c. Automatic Compliance Response <br />The permittee is responsible for implementing the automatic compliance response provisions of this permit <br />when one of the following occurs: <br />• there is a violation of the permit limit (both the NOEC and the IC25 endpoints are less than the <br />applicable IWC) <br />• two consecutive monitoring periods have resulted in failure of one of the two statistical endpoints <br />(either the IC25 or the NOEC) <br />• the permittee is otherwise informed by the Division that a compliance response is necessary <br />When one of the above listed events occurs, the following automatic compliance response shall apply. The <br />permittee shall either: <br />• conduct accelerated testing using the single species found to be more sensitive <br />• conduct a Toxicity Identification Evaluation (TIE) or a Toxicity Reduction Evaluation (TRE) <br />investigation as described below. <br />i. Accelerated Testing <br />