Laserfiche WebLink
Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year Zo/S <br />038aw,e��soyr2ces <br />mine name permit # Permittee <br />Address:�6 Y. lf3a0Y1i1q� <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br />Land Status Category <br />Last Years <br />Cumulative Total <br />This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed <br />SS. <br />+ <br />Cumulative <br />= <br />SS <br />Acres backfilled and graded <br />.5" <br />+ <br />than 10 <br />I <br />_ <br />Total <br />Acres to soiled <br />year <br />+ <br />less <br />= <br />2 <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for <br />Par -h catpnnry hPlow no not include acres that have achieved final. Phase III release. <br />*include, if necessary, a description of any augmented seeding or dultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 453, and the total number of acres.- <br />Phase <br />cres:Phase I released Phase II released_ Phase III released <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 <br />Acreage in active mining areas 3 _ <br />'(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head -of -hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />Last Years <br />This <br />Greater <br />Cumulative <br />Calendar <br />Cumulative <br />I 1 <br />10 years or <br />1 <br />I <br />than 10 <br />I <br />Total <br />year <br />Total' <br />less <br />years' <br />Acres seeded* <br />+ <br />_ _ I <br />Y7, 0 <br />+ <br />S17, in <br />*include, if necessary, a description of any augmented seeding or dultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 453, and the total number of acres.- <br />Phase <br />cres:Phase I released Phase II released_ Phase III released <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 <br />Acreage in active mining areas 3 _ <br />'(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head -of -hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />