2015 ANNUAL REPORT <br />JAKE KAUFFMAN & SON, INC. <br />Permit M-1999-069 <br />Wagner/Kauffman Pit #3 <br />PHASE 1 Final release on November 30, 2012 <br />PHASE 11 Lined storage reservoir <br />Mining is complete, banks were finished and final grading was being done when the September <br />13, 2013 Big Thompson River flooded filling the reservoir. Evaporation is steadily bringing the water <br />level down close to the bottom and if there are no further heavy rains reconstruction of the banks and <br />removing excess dirt from the bottom will take place in the spring and summer of 2016. <br />PHASE 111 Mining is complete. The blue section was seeded in 2013, the brown section filled in to <br />grade. The banks (green color) are being repaired/shaped and should be finished by fall of 2016 if <br />weather conditions allow. <br />Reclamation on the water storage (Phase 11) and the small lake in Phase 111 are being reclaimed <br />simultaneously using top soil that was saved for this purpose during mining operations. <br />Ka <br />--"g- <br />Mary an Co orate <br />Secretary <br />p <br />Jake Kauffman & Son, Inc. <br />970-290-4152 <br />970-667-9985 (fax) <br />