My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-06_PERMIT FILE - C1981019
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2013-10-06_PERMIT FILE - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:08 PM
Creation date
1/11/2016 8:36:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
10/6/2013
Doc Name
Operation and Reclamaiton Plans
Section_Exhibit Name
Volume 15 Rule 2.05
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br />need to be addressed in more detail to determine that Special Handling Procedures, that are outside the <br />normal pit operational procedures, will not be needed in the Collom expansion area. Review of the <br />analysis spreadsheets in Exhibit 6, Item 9 demonstrate minimal instances of analyses for pH, electrical <br />conductivity, nitrate as N and Acid -Base potential being outside of the suitable range for the four drill <br />holes analyzed above. <br />Based on similarities between overburden suitability analysis results in the Colowyo existing permit area <br />and the Collom permit expansion area, and on previous discussions between CDRMS and Colowyo, <br />suspect levels of Sodium Adsorption Ratio (SAR), Selenium (Se), Boron (B), Saturation percent (Sat), <br />and Molybdenum (Mo) will not need to be addressed in more detail to determine if Special Handling <br />Procedures, that are outside the normal pit operational procedures, will be needed in the Collom area. <br />Historically, beginning around 1983, Colowyo initiated overburden monitoring in both the pit <br />(truck/shovel materials) and on regraded overburden. See CDRMS Permit Exhibit 6, Item 4 as described <br />in the associated January 4, 1983 Colowyo memo to Dan Mathews, CDRMS, for an overview of this <br />initial program. Starting in 1990, Colowyo eliminated the in -pit sampling program. Sufficient data had <br />been collected to indicate that all weathered overburden material (ie within — 50 fee of the ground <br />surface) was suitable for replacement onto the reclaimed surface prior to topsoil replacement. Three <br />revisions were submitted to the Division and approved on January 24, 1984, August 17, 1983, April 24, <br />1990, and PR -02 respectively. The following summarizes the requirements of the current regraded <br />overburden (backfill) sampling program and supersedes all previous commitments. It is based on the <br />following limitations of the earlier program. <br />1. Placing weathered overburden material onto reclamation areas prior to final regarding, and <br />2. Sampling regraded overburden at a density of one composite surface sample per 5 acres of <br />regraded spoil. <br />The regrading of overburden is an event that takes place sporadically during the year. Once backfill areas <br />are regraded, but prior to topsoil replacement, the new locations are identified and sampled. A life -of- <br />mine sampling grid has been established on 500 -foot centers, and each sample location on the grid <br />corresponds to a letter /number combination as established on the sampling map. Using this grid interval, <br />each sample location represents an area of about 5.7 acres in size. A hand shovel is used to take small, <br />representative surface samples of spoil across the sample area. <br />Regraded Overburden Suspect Levels: <br />Parameter <br />Suspect Level <br />H <br />Less than 5 or greater than 9 standard units <br />Electrical Conductivity <br />Greater than 12 millimhos /cm <br />Sodium Absorption Ratio <br />Greater than 15 <br />The laboratory results are kept at the mine site. Results of the sampling program are provided in the <br />appropriate Annual Reclamation Report and are periodically checked during CDRMS quarterly complete <br />inspections. <br />The mining sequence for the planned operation is shown on the Mine Plan Map (Map 23B). Cross <br />sections showing the post mining pit backfill are presented on the Pre - Mining and Post - Mining Cross <br />Sections (Map 20C). The temporary overburden stockpile location is presented on Map 23B. The map <br />depicting spoil grading is presented as Map 29B. <br />Collom— Rule 2, Page 102 Revision Date: 9/28/11 <br />Revision No.: PR -03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.