Laserfiche WebLink
Table of Contents <br /> <br /> <br />I.Introduction <br /> <br />II.Procedures and Summary of Bond Release Process <br /> <br />III.Criteria for Bond Release <br /> <br />IV.Observations and Findings <br /> <br />V.Proposed Decision <br /> <br />Attachments: <br /> <br />Table 1. Summary of All Bond Release Acreages <br />Table 2. Summary of All Bond Release Amounts <br />Table 3. Specifications for Drainage Ditches <br />Table 4. Summary of SL-08 Bond Release Amounts <br /> <br />Figure 1. SL-08 Zone Location Map <br />Figure 2. Zone 1 Elevation Comparison Chart <br />Figure 3.Zone 1 – approximate locations of GPS points for elevation check <br /> <br />Figure 4. Zone 2 Elevation Comparison Chart <br />Figure 5. Zone 2 – approximate locations of GPS points for elevation check <br />Figure 6. Zone 3 Elevation Comparison Chart <br />Figure 7.Zone 3 – approximate locations of GPS points for elevation check <br /> <br />Figure 8. Zone 4 Elevation Comparison Chart <br />Figure 9.Zone 4 – approximate locations of GPS points for elevation check <br /> <br />Figure 10. Zone 5 Elevation Comparison Chart <br />Figure 11.Zone 5 – approximate locations of GPS points for elevation check <br /> <br />Figure 12. Zone 6 Elevation Comparison Chart <br />Figure 13.Zone 6 – approximate locations of GPS points for elevation check <br /> <br />Figure 14. Zone 7 Elevation Comparison Chart <br />Figure 15.Zone 7 – approximate locations of GPS points for elevation check <br /> <br /> <br />I. INTRODUCTION <br /> <br />This document is the proposed decision of the Colorado Division of Reclamation, Mining, and <br />Safety (Division) in response to a request for Partial Phase I Bond Release at the Colowyo Mine, <br />Permit Number C-1981-019, bond release application number SL-08. The package contains five <br />parts. These include: 1) Introduction; 2) Procedures and Summary of the Bond Release Process; 3) <br />Criteria and Schedule for Bond Release; 4) Observations and Findings of the Division regarding <br />compliance with the bond release requirements of the Colorado Surface Coal Mining and <br />Reclamation Act and regulations promulgated thereunder; and 5) the Division’s Proposed Decision <br />on the request for bond release. <br /> <br />Detailed information about the review process can be found in the Act and the Regulations of the <br />Colorado Mined Land Reclamation Board for Coal Mining. All Rules referenced within this <br /> <br />Proposed Decision and Findings of Compliance January 2016 <br />Partial Phase I Bond Release SL-08 Page 1 <br /> <br />