Laserfiche WebLink
TABLES AND FIGURES <br /> <br />Table 1. Summary of All Liability Releases (acres) <br /> <br /> Total Disturbed Phase I Released Phase II Released Phase III Released <br /> <br />Permitted 5,214.8 <br />SL-01 226.4 176.4 <br />SL-02 712.1 <br />SL-03 762.1 <br />SL-04 494.2 420.9 <br />SL-05 979.5 <br />SL-06 692.4 <br />SL-07 125.2 <br />SL-08 189.6 <br /> <br />Totals 5,214.8 2,439.9 1,359.4 979.5 <br /> <br /> <br />Table 2. Summary of All Bond Release Dollars <br /> <br />Action Liability* Phase I Released Phase II Released Phase III Released <br /> <br />SL-01 $ 19,581,899.00 $ 0.00 $ 857,342.00 $ 0.00 <br />SL-02 $ 15,670,521.00 $ 0.00 $ 0.00 $ 0.00 <br />SL-03 $ 14,102,823.00 $ 0.00 $ 0.00 $ 0.00 <br />2010 Midterm $ 83,156,939.00 $ 0.00 $ 0.00 $ 0.00 <br />SL-04 $ 80,570,965.00 $ 0.00 $ 2,585,974.00 $ 0.00 <br />SL-05 $ 68,825,509.00 $ 0.00 $ 0.00 $ 692,320.00 <br />SL-06 $ 78,052,169.00 $ 2,465,660.00 $ 0.00 $ 0.00 <br />SL-07 $ 80,517,829.00 $ 727,269.00 $ 0.00 $ 0.00 <br />SL-08 $ 77,073,267.00 $ 3,444,562.00 $ 0.00 $ 0.00 <br /> <br />Totals N/A $ 6,637,491.00 $ 3,443,316.00 $ 692,320.00 <br /> <br />*Liability amount may not correlate from one SL to another due to other revisions being approved in the interim <br /> <br /> <br />Table 3. Specifications for Drainage Ditches <br /> <br />Ditch Bottom width (ft) Depth (ft) Side slope Riprap D50 <br />(inches) <br />West Pit Fill Ditch > 10 > 2 3:1 12” – 24” <br />Gulch A Ditch > 10 >2.5 3:1 9” – 15” <br /> <br /> <br /> <br />Proposed Decision and Findings of Compliance January 2016 <br />Partial Phase I Bond Release SL-08 Page 9 <br /> <br />